Laserfiche WebLink
In addition to the SB CSAH 56 left turn lane construction at 148t" Avenue NW, <br />construction of a NB right turn lane is will also be required. In addition, if the <br />secondary RI/RO access point is to be constructed within 500 feet north of <br />CSAH 116, the construction of a NB CSAH 56 right turn lane will be required <br />at that access location as well. <br />The ACHD Engineering Plan Review process will apply to this site. <br />Calculations must be submitted along with a grading and erosion control plan <br />that delineates the drainage areas for this development. The post -developed <br />rate/volume of runoff must not exceed the pre -developed rate/volume of runoff <br />for the 10-year, critical design storm. Contact Nicholas Dobda, Engineer III, via <br />telephone at 763.862.4261, or via e-mail at NicholasDobdaCcx7co.anoka.mn.us, <br />for further information and to coordinate the ACHD Engineering Plan Review <br />process. Please submit the turn lane construction plans, drainage calculations, <br />grading and erosion control plans, ACHD Design Requirements Checklist for <br />County Highway Modifications (copy available via our website), and the <br />applicable engineering plan review (estimated at $450.00); fee to Mr. Dobda <br />for his review and approval. <br />Following completion of the ACHD Engineering Plan Review process, the <br />ACHD permit process can begin. A Commercial Access Permit (permit fee = <br />$250.00), and a Permit for Work Within County Right of Way (permit fee = <br />$150.00) are required and must be obtained prior to the commencement of any <br />construction. License Permit Bonding, methods of construction, design details, <br />work zone traffic control, restoration requirements and follow-up inspections <br />are typical elements of the permitting process. Contact the Permit Office at <br />763.862.4224 for further information regarding the permit process. <br />Thank you for the opportunity to comment. Feel free to contact me if you have any <br />questions regarding this review. <br />Jane K. Rose <br />Traffic Engineering Manager <br />xc: File - CSAH 56/Plats + Developments/2017 <br />Larry Holum, County Surveyor <br />Randy Bellinger, Traffic Engineering Coordinator <br />Terri Vaughan, Traffic Engineering Technician III <br />Permit Office <br />Nicholas Dobda, Engineer III <br />