Laserfiche WebLink
Amy Geisler <br />RE: Preliminary Plat <br />Regency.Pond 4tt' Addition (formerly known as Outlot A of Regency Pond) <br />August 3, 2004 <br />Page 2 <br />If any work is to be performed within the county right of way, a permit is required and must be obtained prior to the <br />commencement of construction (permit .to work within R/W= $110.00 for each affected roadway). License Permit <br />Bonding, methods of construction, design details, work zone traffic control, restoration requirements and follow-up <br />inspections are typical elements of the permitting process. • Contact Roger Butler, Traffic Engineering Coordinator, or <br />Terri Klein, Permit Technician, for further information regarding the permit proce s. Please note that this department <br />is not prepared to issue any access permits for this site. <br />Thank you for the opportunity to comment. Feel free to contact me if you hay.: a `ions regarding this review. <br />Sincerely, <br />Jane K. Rose <br />Traffic Engineering Manager <br />xc: CR 56 + CSAH 116/PLATS/2004 <br />Roger Butler, Traffic Engineering Coo <br />Josie Scott, Traffic Engineering Techn <br />Terri K1ein,.Permit Technician <br />Mike Kelly, Chief Right Of Wa <br />Larry Iloium, County Surveyor <br />Andrew Witter, Construioni er <br />J <br />