Laserfiche WebLink
7. CONCLUSIONS AND RECOMMENDATIONS <br />City of Ramsey Improvement Project No. 18-02 proposes to reconstruct the bituminous <br />pavement section, to remove the existing bituminous curb and replace it with a combination of <br />B618 concrete curb and gutter and bituminous curb, and to complete miscellaneous appurtenant <br />work on the following street segments within the HY-10 Ramsey commercial subdivision: <br />1. 146th Avenue (approx. 230 linear feet) — Ferret Street to bulb of east cul-de-sac. <br />2. 147th Avenue (approx. 190 linear feet) — Ferret Street to 180 feet west of Armstrong <br />Boulevard. <br />3. Ferret Street (approx. 900 linear feet) — 146th Avenue to north cul-de-sac. <br />It is the recommendation of City staff that City Project No. 18-02 is feasible, necessary, and cost- <br />effective from an engineering standpoint, and this project would best be constructed as a stand- <br />alone project as proposed herein. <br />The following Staff recommendations related to the proposed project are presented for Council <br />consideration and concurrence: <br />1. Staff recommends shelving the project until such time that it is no longer needed, or <br />until the property owners request that the streets be repaired. <br />The City Council is asked to act on the following items related to the proposed project: <br />1. Adopt Resolution #18-217 accepting this Feasibility Report, but shelving the project until <br />such time that it is no longer needed, or until the property owners request that the streets <br />be repaired. <br />Feasibility Report <br />HY-l0 Ramsey Street Reconstructions <br />City of Ramsey Project No. 18-02 <br />Page 15 <br />