Laserfiche WebLink
Our !Almon: To work together to respcaibty grow Our community, and to provide quality, COM4ffeciive, and efficient government ser ices. <br />CC Regular Session 7. 7. <br />Meeting Date: 10/23/2018 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Information <br />Title: <br />Adopt Resolution #18-219 Accepting Feasibility Report and Ordering Public Hearing for Improvement Project <br />#19-01, Ford Brook Estates Street Reconstructions <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to consider adopting Resolution #18-219 accepting the Feasibility Report and ordering a <br />Public Hearing for Improvement Project #19-01, Ford Brook Estates Street Reconstructions. <br />Background: <br />City Improvement Project No. 19-01 proposes to reconstruct streets within the Ford Brook Estates neighborhood <br />including 180th Lane and Krypton Street. The streets total approximately 860 linear feet (0.16 miles) in length. A <br />map showing the location and scope of the proposed improvements is included as Figure 1 in Appendix A in the <br />attached Feasibility Report. <br />The streets were constructed in 1981 as rural sections with bituminous pavement to a width of 24 feet, and are <br />generally centered within a 66-foot wide right-of-way. <br />The storm sewer system consists of ditches along both sides of the road within the right-of-way and drainage and <br />utility easements. Storm runoff collects in the ditch along TH 47 and is carried north to Ford Brook. <br />The existing bituminous pavement section ranges from 1.2 to 6.4 inches thick, with a median thickness of 4.3 <br />inches, and the aggregate base ranges from 2.4 to 6.8 inches thick, with a median thickness of 4.1 inches. This was <br />determined from Ground Penetrating Radar (GPR) analysis performed by Braun Intertec in 2017, as well as from <br />field observations and record plan documents. Copies of Braun Intertec's GPR results are attached inAppendix C. <br />The pavement section was built on silty sand and lean clay subgrade materials generally not considered ideal for <br />pavement support. <br />City Staff evaluates and rates the condition of pavement sections on all City streets on an annual basis using the <br />Pavement Surface Evaluation and Rating (PASER) system. In the summer of 2018, the pavement section of the <br />above referenced street segments were rated with a PASER rating of 2 which indicates these streets require <br />complete reconstruction. City staff patch the streets at least once per year, particularly before winter so the streets <br />can be plowed without further damaging the pavement in the process. Pictures of the streets are located inAppendix <br />A in the attached Feasibility Report. <br />Proposed improvements include removing the existing bituminous pavement and aggregate base along with 2 feet <br />of the unsuitable subgrade material. Two (2) feet of select granular sand will then be placed over geotextile fabric, <br />with drain tile added at the low points, followed by 4 inches of aggregate base, and 3.5 inches of bituminous <br />