Laserfiche WebLink
Our !Almon: To work together to respcaibty grow Our community, and to provide quality, COM4ffeciive, and efficient government invoices. <br />CC Regular Session 7. 9. <br />Meeting Date: 10/23/2018 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Information <br />Title: <br />Adopt Resolution #18-221 Accepting Feasibility Report and Ordering Public Hearing for Improvement Project <br />#19-03, Wood Pond Hills and Chestnut Ridge Street Reconstructions <br />Purpose/Background: <br />Purpose: The purpose of this case is to consider adopting Resolution #18-221 accepting the Feasibility Report and <br />ordering a Public Hearing for Improvement Project #19-03, Wood Pond Hills and Chestnut Ridge Street <br />Reconstructions. Background: City Improvement Project No. 19-03 proposes to reconstruct streets within the <br />Wood Pond Hills and Chestnut Ridge neighborhoods including 146th Avenue, Helium Street, and Krypton Street. <br />The streets total approximately 3,310 linear feet (0.63 miles) in length. A map showing the location and scope of <br />the proposed improvements is included as Figure 1 in Appendix A. The streets were constructed between 1992 and <br />1994 with bituminous pavement, surmountable concrete curb and gutter, and concrete storm sewer. The streets <br />were constructed to a width of 30-feet from face -of -curb to face -of -curb, and are centered within a 60-foot wide <br />right-of-way. The existing bituminous pavement section ranges from 1.6 to 5.0 inches thick, with a median <br />thickness of 2.5-inches. This was determined from Ground Penetrating Radar (GPR) analysis performed by Braun <br />Intertec in 2017, as well as from field observations and record plan documents. Copies of Braun Intertec's GPR <br />results are attached in Appendix C. The pavement section was built on generally poorly graded sand with silt <br />subgrade material generally considered usable for pavement support with proper conditioning. City staff evaluates <br />and rates the condition of pavement sections on all City streets on an annual basis using the Pavement Surface <br />Evaluation and Rating (PASER) system. In the summer of 2018, the pavement sections of the above referenced <br />street segments were rated with a PASER rating of 2, with the exception of the south half of Krypton Street <br />receiving a rating of 4. Ratings of 4 and below indicate these streets require complete reconstruction. City Staff <br />patch the streets at least once per year, particularly before winter so the streets can be plowed without further <br />damaging the pavement in the process. Pictures of the streets are located in Appendix A. Proposed improvements <br />include removing and replacing all damaged concrete curb and gutter sections, and reconstructing the existing <br />bituminous pavement section using the Full Depth Reclamation (FDR) process. This process would involve <br />reclaiming the entire existing bituminous pavement section, along with the existing aggregate base. This reclaim <br />material would then be spread over the reshaped and compacted subgrade between the curb and gutter, then the top <br />3 r/2 -inches of reclaim material would be removed and hauled off site, after which 3 r/2 -inches of new bituminous <br />pavement would be installed over the remaining compacted reclaim material. This would result in a 7-ton pavement <br />design, which is standard for residential streets. Existing sanitary sewer and watermain infrastructure are in good <br />condition. The existing storm sewer system is also in good condition with only minor work being proposed. The <br />engineer's opinion of probable costs for completing the proposed improvements outlined in this report is <br />$372,236.52. Estimated costs include 5-percent contingency costs plus 23-percent indirect costs for administrative, <br />engineering, finance and legal costs. A summary of the engineer's opinion of probably costs is included in <br />Appendix B. A total of 59 assessable parcels have been identified. Staff recommends applying 25-percent of the <br />eligible project costs equally across the 59 assessable properties using the "per lot" assessment method. Eligible <br />project costs include everything except subgrade correction costs. This results in a proposed preliminary assessment <br />