My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 10/23/2018
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2018
>
Agenda - Council Work Session - 10/23/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:56:45 PM
Creation date
11/30/2018 9:54:40 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
10/23/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Ramsey, Minnesota <br />Capitol Improvement Program <br />2019 2028 <br />PROJECTS BY YEAR & PRIORITY <br />Project. Name <br />I 20I11 11 <br />Polarity 1-ExistingObfigatiOn (Hight) <br />Server LSrluelizebon Pry (Replace Servers) <br />Replace Ford Taurus .403 <br />Replace 200e Fond Taurus <br />Replace 2005 Chevy Colorado <br />Replace 2006 Fad Taurus <br />Replace 2006 Ford Taurus <br />Replace Fire Preverdinn Velriolta (566) <br />Replacement al Exlricalicn Tolls R-21 <br />Replace Thermal Image Camera <br />2018 Chem Tahoe to Replace 2013 CNN Tahoe *332 <br />2019 Chew Caprice to Replan 2914 Chev Caprice 4342 <br />Replace ErrgrVeh t402 MEti 2917 CIVIC Sierra <br />Replace 1991 Ch rper. Unit 0619 <br />Replace 2001 Case Backhoe: Unit 4934 <br />Replace 2005 di4 Tar Truck 4x4 WPIpw Unit it 651 <br />Replace 2014 Ear Mark Mower: Unilil68J <br />Replace 2014 Ear Mark Mower: Unit NH <br />Replace 2014 Ex tvlaark Mower: Unit It685 <br />Replace Pumps el Lift Station #4 <br />Summed Drive Roundabout Landscaping <br />Reconstruction SlreetT Ford Brook EstateeJHy 10 <br />Reconstruction Streets Bra ekview Eat, CheskrutWo <br />Priority New Addition (High) <br />Bullex Attack Training Prop <br />New sidewalk Machine <br />Elrnarest Park & The Draw Park Entrance & Sig <br />Ohsaravalion hnardwaik - Lake Itasca <br />The Draw Grates <br />Dag Park Sheller -Alpine Park <br />Amphitheater Lighting <br />COR Regional irrfilkation Basin <br />chest Central Structure Improvnrnenta <br />Bunker Lake Blvd & Perna Street Lights <br />Riverdale Dave Street Lights <br />Department Project <br />Capital Equipment <br />Capital Equipment <br />Capital Equipment <br />Capital Equipment <br />Capital Equipment <br />Capital Equipment <br />Capital Equipment <br />Capital Equipment <br />Capital Equipment <br />Capital Equipment <br />Capital Equipment <br />Capital Equipment <br />Capital Equiprrnl <br />Capital Equipment <br />Capital Equipment <br />Capital Equipment <br />Capital Equipment <br />Capital Equipment <br />Sewer Ulildy <br />Street Impravernenla <br />Street Improvements <br />Street Improvements <br />Capital Equipment <br />Capital Equipment <br />e Park lmpravemenla <br />Park Improvements <br />Park Improvements <br />Park Improvements <br />Park Improvements <br />Stour wafer Light/ <br />Stormwaler USly <br />Street Light Utlity <br />Street Light Utility <br />Friarily5-OpportunityJJ frrndedJP1acertdfdrr <br />Trail Ccnne lions <br />peaalion far Sunfish Lake & The Draw <br />Ramsay Bawd RR Underpass <br />Park Improvements <br />Park lmprevements <br />Street Improvements <br />19-fral1 <br />A Jlv N-403 <br />i4DM N•d04 <br />BUILD 40i <br />BUILD-4055 <br />BUILD-406 <br />FIi3E-5O <br />FIFti -568 <br />Fll E-572 <br />POL-332 <br />POL-342 <br />PW--442 <br />PW--519 <br />PW-fi34 <br />AW-651 <br />PW-691 <br />AW 502 <br />PW 593 <br />19-SE W ddt <br />15-STR-0O3 <br />15-STR-006 <br />15•STR-Qi2 <br />FIRE-571 <br />PWT004 <br />04-PARK-0043 <br />O6•PARK-011 <br />12 ANKOO8 <br />1 T•PA RK•OCE <br />hi -PA RK-003 <br />16-ST4 002 <br />19-STPAt Of <br />f9-STr. r•OO1 <br />19•srLr-00 2 <br />O6-PAFiK•019 <br />1S-PARK 005 <br />1S-STR•002 <br />Priority <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />7vrrrl for Priorrry 1 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 mai for; Priority 2 <br />5 <br />5 <br />5 <br />Project Cost <br />200,900 <br />29,000 <br />29,000 <br />22,500 <br />29,000 <br />27,000 <br />45,000 <br />50,000 <br />30,000 <br />40,500 <br />30,500 <br />31,500 <br />33,800 <br />71,500 <br />48,000 <br />10,800 <br />10,800 <br />10,800 <br />40,000 <br />20,000 <br />506,910 <br />712,225 <br />2,028,835 <br />15,000 <br />139,000 <br />80,000 <br />60,000 <br />10,900 <br />58,000 <br />40,000 <br />1,100,000 <br />75,000 <br />80,000 <br />50,000 <br />1,707,000 <br />30,000 <br />40,000 <br />4,500,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.