My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/08/2019
Ramsey
>
Public
>
Agendas
>
Council
>
2019
>
Agenda - Council - 01/08/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2025 12:08:20 PM
Creation date
1/11/2019 2:06:59 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/08/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
438
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. INTRODUCTION <br />2.1 Authorization <br />The preparation of this report was authorized by the Ramsey City Council on August 28, 2018. <br />This project has been designated as City Improvement Project No. 19-02. <br />2.2 Program Overview <br />In support of the City's long-term Street Maintenance Program, the existing bituminous pavement <br />section will be reconstructed, and existing ditches will be re -graded to enhance drainage. Other <br />appurtenant work will be completed as outlined in this report. <br />The City' s pavement evaluation process involves a visual evaluation of each street's pavement <br />surface based on the type, extent and severity of each pavement distress observed. Numerous types <br />of pavement distresses may exist within a pavement section including, but not limited to, alligator <br />cracking, block cracking, longitudinal cracking, transverse cracking, rutting, raveling, shoving, <br />potholes and patches. This field data is then used to rate the pavement condition. <br />The City uses the Pavement Surface Evaluation and Rating (PASER) system to rate pavement <br />condition. A PASER rating is a numerical index between 1 and 10 indicating the condition of a <br />pavement based on the various pavement distresses recorded during visual observations. A PASER <br />rating of 10 represents brand new pavement, while a PASER rating of 1 represents a pavement <br />section that has fallen into complete disrepair requiring full reconstruction. <br />In the summer of 2018, City Staff evaluated and rated the condition of the pavement along the <br />Brookview Estates street segments. A PASER rating of 3 was assigned to 173rd Avenue and <br />Germanium Street. <br />2.3 Scope <br />City of Ramsey Improvement project 19-02 proposes to reconstruct the existing bituminous <br />pavement, re -shape the ditches to enhance drainage, and to complete other appurtenant work on <br />173rd Avenue from Germanium Street to its termini cul-de-sac, and Germanium Street from 170th <br />Lane to its termini cul-de-sac which totals approximately 2,662 linear feet (0.50 miles) in length. <br />The existing bituminous pavement section is proposed to be reconstructed using the FDR process. <br />This involves reclaiming the entire bituminous pavement section along with a portion of the <br />existing aggregate base, hauling and disposing of excess reclaim material off -site, spreading and <br />compacting the reclaimed material on top of the reshaped and compacted subgrade, then placing <br />3.5-inches of new bituminous pavement on top. The resulting pavement design will generally meet <br />current City design standards for residential pavement sections. <br />A map showing the location and scope of the proposed improvements is included as Figure 1 in <br />Appendix A. <br />Feasibility Report <br />Brookview Estates Street Reconstructions <br />City of Ramsey Project No. 19-02 <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.