My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/08/2019
Ramsey
>
Public
>
Agendas
>
Council
>
2019
>
Agenda - Council - 01/08/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2025 12:08:20 PM
Creation date
1/11/2019 2:06:59 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/08/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
438
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. PROPOSED IMPROVEMENTS <br />4.1 Street and Stormwater Improvements <br />4.1.1 Street Improvements <br />The streets in Brookview Estates are proposed to be reconstructed by matching existing <br />widths and elevations with bituminous pavement and ditch sections to carry storm water <br />runoff to Ford Brook and the Rum River. <br />The proposed surface improvements are shown on Figure 1 in Appendix A. <br />Street Design: <br />173rd Avenue and Germanium Street are currently rural residential streets with ditch <br />sections, 24-feet wide to the edge of pavement. The cul-de-sacs on 173rd Avenue and <br />Germanium Street are 95-feet in diameter. Existing and proposed traffic counts are <br />consistent with typical residential streets. <br />All street segments are proposed to be reconstructed at their current width. A typical section <br />for the proposed pavement reconstruction improvements is shown in Figure 2 in Appendix <br />A. <br />City Staff is proposing a pavement section design of 1.5-inches bituminous wear course, <br />2-inches bituminous base course, and 4-inches of aggregate base composed of full -depth <br />reclamation material. This pavement section would be constructed over the existing <br />subgrade after it is reshaped and compacted. <br />4.1.2 Storm Sewer Improvements <br />The existing ditch sections are in good condition. Re -shaping the ditches may be required <br />due to construction, but ditches will be restored to existing grades. The existing driveway <br />culverts are not anticipated to be replaced. No stormwater treatment improvements are <br />required for this projects since the street is proposed to be reconstructed at its current width, <br />however, Staff is proposing to add a treatment structure to improve storm runoff water <br />going into Trott Brook. <br />4.1.3 Geotechnical Considerations <br />Northern Technologies LLC (NTI) completed a Geotechnical Exploration and Engineering <br />Review including seven (7) soil borings, generally evenly spaced along 173rd Avenue and <br />Germanium Street. The locations of the borings are shown in the Boring Location Map in <br />Appendix C of NTI's report, attached in Appendix C. NTI recommends prior to installing <br />the aggregate base, the existing subgrade should be scarified and re -compacted to a depth <br />of at least 12 inches. A proof roll test should then be performed to determine soft or unstable <br />subgrade areas. If rutting or localized unstable subgrade areas are observed, those areas <br />Feasibility Report <br />Brookview Estates Street Reconstructions <br />City of Ramsey Project No. 19-02 <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.