My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/08/2019
Ramsey
>
Public
>
Agendas
>
Council
>
2019
>
Agenda - Council - 01/08/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2025 12:08:20 PM
Creation date
1/11/2019 2:06:59 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/08/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
438
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.2 Stormwater Treatment <br />No stormwater retention and/or treatment improvements will be required as a result of this project, <br />however, Staff is proposing stormwater treatment for storm runoff into Trott Brook. <br />4.3 Water Main Improvements <br />No watermain improvements are proposed with this project. <br />4.4 Sanitary Sewer Improvements <br />No sanitary sewer improvements are proposed with this project. <br />4.5 Construction Method <br />The existing bituminous pavement section will be reconstructed using the FDR process outlined <br />within this report. <br />4.6 Private Utilities <br />Staff has not yet met with the telephone, gas, power and cable utilities regarding this project. <br />During preparation of plans and specifications, Staff will meet with the private utility companies <br />to discuss the proposed improvements as noted in the project schedule within this report. The <br />alignment and footprint of the streets will be considered to minimize impacts to private utilities. <br />No impacts to power poles or street lights are anticipated with this project. <br />Should any utility company indicate they wish to upgrade, replace and/or otherwise modify their <br />services during this project, any such upgrades, replacements and/or modifications will be at the <br />sole discretion and cost of the utility company. <br />4.7 Permits <br />Permits that are anticipated to be required as part of the proposed improvements include: <br />• MPCA General Stormwater Permit (NPDES) Grading and Storm Water <br />A stormwater permit from the Lower Rum River Watershed Management Organization will not <br />be required with this project as street reconstruction projects are exempt. <br />4.8 Right -of -Ways / Easements <br />The existing outfall to Trott Brook is currently located on 17331 Germanium Street outside of <br />City -owned drainage and utility easements. Staff will work with the property owner to create <br />additional drainage and utility easement over the existing pipe, move the outfall which would also <br />Feasibility Report <br />Brookview Estates Street Reconstructions <br />City of Ramsey Project No. 19-02 <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.