My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/08/2019
Ramsey
>
Public
>
Agendas
>
Council
>
2019
>
Agenda - Council - 01/08/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2025 12:08:20 PM
Creation date
1/11/2019 2:06:59 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/08/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
438
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. CONCLUSIONS AND RECOMMENDATIONS <br />City of Ramsey Improvement Project No. 19-02 proposes to reconstruct the bituminous pavement <br />section, and complete miscellaneous appurtenant work on the following street segments within the <br />Brookview Estates residential subdivision: <br />1. 173rd Avenue (approx. 850 linear feet) — Germanium Street to east cul-de-sac. <br />2. Germanium Street (approx. 1810 feet) — 170th Lane to north cul-de-sac. <br />It is the recommendation of City Staff that City Project No. 19-02 is feasible, necessary, and cost- <br />effective from an engineering standpoint, and this project would best be constructed as a stand- <br />alone project as proposed herein. <br />The following Staff recommendations related to the proposed project are presented for Council <br />consideration and concurrence: <br />1. Reconstruct the existing bituminous pavement using full -depth reclamation process, <br />meeting the City's standard residential pavement section of 4-inches aggregate base <br />class 5 (or reclaim), 2-inches new bituminous base course, and 1 1/2- inches new <br />bituminous wear course. <br />2. Staff recommends excluding private irrigation system work form this project. Instead, <br />Staff will notify property owners of pending construction as far in advance as possible, <br />and instruct them to relocate their irrigation system(s) away from the construction area <br />during construction, then allow replacement in or near the original location after <br />construction is complete. <br />3. Staff recommends holding a neighborhood information meeting on November 8, 2018 <br />to inform property owners of the proposed improvements and to gather their input prior <br />to competing plans and specifications and requesting Council approval to advertise for <br />bids as outlined in the project schedule. <br />4. Order an assessment appraisal consultation to ensure special assessments do not exceed <br />the benefit received as a result of the improvements. <br />The City Council is asked to act on the following items related to the proposed project: <br />1. Accept the preliminary residential special assessment rate of $4,418.30 per lot. <br />2. Authorize an assessment appraisal consultation to ensure all special assessments are <br />commensurate with benefit received from the proposed improvements. <br />3. Adopt Resolution #18-220 accepting this Feasibility Report and ordering the Public <br />Hearing for November 13, 2018. <br />Feasibility Report <br />Brookview Estates Street Reconstructions <br />City of Ramsey Project No. 19-02 <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.