Laserfiche WebLink
Storm Sewer Construction <br />Item <br />No. <br />Description <br />Unit <br />Estimated <br />Quantity <br />Unit Cost <br />Cost Extension <br />1 <br />Geotextile Fabric Type V <br />SY <br />21 <br />$ 3.50 <br />$ 73.50 <br />2 <br />15" RC Pipe Apron <br />EA <br />4 <br />$ 600.00 <br />$ 2,400.00 <br />3 <br />Trash Guard for 15" RC Pipe Apron <br />EA <br />4 <br />$ 275.00 <br />$ 1,100.00 <br />4 <br />15" RC Pipe Sewer, Design 3006 Class III <br />LF <br />628 <br />$ 33.00 <br />$ 20,724.00 <br />5 <br />Construct Drainage Structure Design 48-4020 <br />EA <br />3 <br />$ 2,500.00 <br />$ 7,500.00 <br />6 <br />Construct Drainage Structure Design Special 48- <br />4020 <br />EA <br />1 <br />$ 3,500.00 <br />$ 3,500.00 <br />7 <br />F&I Casting Assembly — Storm <br />EA <br />4 <br />$ 800.00 <br />$ 3,200.00 <br />8 <br />Random Rip Rap Class III <br />CY <br />5 <br />$ 150.00 <br />$ 750.00 <br />Total Storm Sewer Construction Cost <br />$ 39,247.50 <br />5% Contingency Cost <br />$ 1,962.38 <br />23% Indirect Cost <br />$ 9,478.27 <br />Total Storm Sewer Project Cost <br />$ 50, 688.15 <br />Total Estimated Project Cost <br />$ 502,555.46 <br />Feasibility Report <br />Brookview Estates Street Reconstructions <br />City of Ramsey Project No. 19-02 <br />