My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/08/2019
Ramsey
>
Public
>
Agendas
>
Council
>
2019
>
Agenda - Council - 01/08/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2025 12:08:20 PM
Creation date
1/11/2019 2:06:59 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/08/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
438
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Brookview Estates Reconstruction <br />Ramsey, Minnesota <br />NTI Project No. 18.MSP06855.000 <br />The Contractor should be aware that the silty subgrade soils will be moisture -sensitive, and protecting <br />them from inclement weather will aid in maintaining stability. The stripping of the existing pavement <br />and aggregate base course should occur immediately prior to subgrade preparation and base aggregate <br />installation to minimize weather -induced instability. <br />Prior to installing the aggregate base, the existing subgrade should be scarified and re -compacted to a <br />depth of at least 12 inches. A proof roll test should then be performed to determine soft or unstable <br />subgrade areas. <br />The proof roll should be performed with a tandem axle dump truck loaded to gross capacity (at least 20 <br />tons). Acceptance criteria of the proof roll shall be limited to rut formation no more than one inch <br />depth (front or rear axles) and no pumping (rolling) observed during the visual inspection. Proof roll <br />tests should be observed by an experienced technician or geotechnical engineer prior to placement of <br />the aggregate base course to verify the subgrade will provide adequate pavement support. <br />If rutting or localized unstable subgrade areas are observed, those areas should be subcut, moisture - <br />conditioned, and re -compacted or removed to a stable depth. <br />If imported fill is required in paved areas, it should consist of debris -free, non -organic, mineral soil <br />similar in composition to the subgrade soils encountered in the surrounding areas. If sand is imported <br />into areas that are underlain by relatively impervious fine grained soils, the sand layer must be drained <br />with drain tile in order to prevent frost heave from water trapped within the imported sand layer <br />during freezing temperatures. Individual lifts of engineered fill should be tempered for moisture <br />content, placed, and compacted as noted in the "Placement and Compaction of Engineered Fill" section <br />in Appendix B of this report. <br />For a 20-year design pavement life, Tables 4 presents our thickness recommendations for flexible <br />(bituminous) pavement. These recommendations were based upon the encountered subgrade <br />conditions, estimated R-value of 30 for the existing subgrade soils, the assumed AADT volumes, and the <br />City of Ramsey's typical pavement section for the respective project area. <br />Pavement Section <br />Table 4: Flexible Pavement Thickness Design' <br />Interstate Area — Residential Area <br />Calculated Required City's Typical <br />Pavement Section2 Pavement Section3 <br />Bituminous Wear Course (inches) 2 1.5 <br />Bituminous Base Course (inches) 2 2 <br />Class 5 or 7 Aggregate Base (inches) 4 4 <br />1. Assumed AADT volume of 600 and an average R-value of 30. <br />2. Assumed a minimum of 12 inches of engineered subgrade. <br />3. The subgrade appeared to be less firm at SB-2 and SB-7 (locations closest to the Rum River). <br />Consideration could be made to using the City's standard section in locations north of SB-2 and west of <br />SB-6. <br />Page 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.