My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/08/2019
Ramsey
>
Public
>
Agendas
>
Council
>
2019
>
Agenda - Council - 01/08/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2025 12:08:20 PM
Creation date
1/11/2019 2:06:59 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/08/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
438
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. COUNCIL BUSINESS <br />7.01: Review Sketch Plan for Harvest Estates 2nd Addition; Case of Meadowbrook <br />Development (Project #18-161) <br />Community Development Director Gladhill reviewed the staff report and stated that the purpose <br />of the case is to review the Sketch Plan prepared by Landform in collaboration with <br />Meadowbrook Development for the purpose of creating 15 new lots next to the Harvest Estates <br />development at 15153 Nowthen Boulevard NW. The site is home to the old municipal center <br />and was platted with the previous Harvest Estates project as Lot 25, Block 1 of Harvest Estates. <br />Councilmember Kuzma asked if a new traffic study has been done as this proposal would <br />include additional homes. <br />Community Development Director Gladhill noted that while a traffic study was not done for this <br />specific project, there were updated traffic figures from the Comprehensive Plan process. He <br />stated that this would be a 15-home development and all roads would continue to operate at an <br />acceptable rate. <br />Councilmember Musgrove stated that this is located in her ward and there was a comment that <br />the County would like to have the development entrance and 151 st equal and asked staff for <br />input. She stated that the terrain between the existing homes and the area proposed to be filled <br />has a steep slope and asked for details on water retention. <br />Community Development Director Gladhill confirmed that the County and City would like to <br />see alignment between the entrance and 1515t. He stated that would not happen at this point but <br />would be part of a long-term vision for the Nowthen corridor. He noted that the realignment <br />would require working with a property owner that would lose a portion of their property to make <br />that possible. He stated that the area is fairly depressed and stated that the grade of the existing <br />stormwater pond would be maintained and the stormwater for this portion of the site would <br />remain onsite and would not impact the existing homes. <br />Mayor LeTourneau confirmed the consensus of the Council in support of the 65-foot lot widths <br />and sketch plan as proposed. <br />Community Development Director Gladhill noted that fill will begin to be brought to the lot in <br />the next week and advised that residents in that area have been notified. He stated that there will <br />be a number of opportunities for residents to provide input on the process in the future as this <br />case moves forward formally. <br />7.02: Consider Purchase Agreement on Lot 25, Block 1, Harvest Estates for Harvest <br />Estates 2nd Addition (former Municipal Center); Case of Meadow Creek Builders <br />(Portions of this case may be closed to the public) <br />City Council / December 11, 2018 <br />Page 9 of 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.