My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 02/07/2019
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2019
>
Agenda - Planning Commission - 02/07/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:33:37 AM
Creation date
2/6/2019 12:01:44 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
02/07/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
476
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
intersection of Sunwood Dr NW <br />and Ramsey Blvd also has <br />underground storage tanks that <br />are double -walled. <br />The city will continue to work to <br />implement these measures. <br />cll <br />® 0 <br />. o u / 0 _ , 2 6. <br />\ ) <br />®� A / <br />/ ' ' • \ k ) 2 _/ <br />° ) 2 .12 \ \ cll ® 2 / § <br />/ § § q.- - / ° i > § b <br />\ § ' d » <br />- \ & 2 0 % <br />2'� 6 % \ u $ § ? <br />— ® ® & % <br />\ ® { , •y ) \� ° ° 0 0 <br />' § 0 » u 6 q z •§ .2 0%/ <br />'0 / 2 'G / 2 ƒ •\ / <br />k -/ H. H Q o k \ o 2 <br />Permits were secured for previous <br />projects and will be obtained for <br />future projects. <br />0 <br />6. <br />0 ; <br />2 { <br />8 <br />g ° <br />§ <br />. up <br />2 <br />..- A- <br />'G cv <br />2 ƒ <br />¥ ._ <br />Permits were secured for previous <br />projects and will be obtained for <br />future projects. <br />remediation of any spills or leaky tanks. <br />When assembling the issues that were to be addressed as <br />part of this AUAR, it was noted by the Anoka Conservation <br />District and by the DNR that there is a possible connection <br />between the increased demand for municipal groundwater <br />and the observed lowering of wetlands in the vicinity of <br />Municipal Wells 3, 4 and 5. Appendix F was prepared to <br />assess the general magnitude of the problem and the <br />solutions required to address the issue. It is now apparent <br />that the wetlands in question experience natural drying <br />during periods of relative low precipitation. The <br />photographic history included as part of the Wetland <br />Delineation report shows wetlands in the vicinity of the <br />COR site disappearing during the mid to late 1980's which <br />is prior to the development of the municipal wells. This <br />same phenomenon occurs again in the mid to late 1990's <br />and prior to the installation of Wells 4 and 5. The evaluation <br />also found, as stated earlier, that drawdown levels in the <br />FIG (Franconia Ironton -Galesville) unit are minimal and, <br />therefore, could not be influencing the wetlands. To verify <br />these finding, however, it is recommended that long term <br />monitoring be performed. <br />There is also some concern that increased pumping in the <br />FIG aquifer could impact private wells that pump from this <br />aquifer. Again, the residual drawdown levels in the FIG <br />average 5- to 10-feet during the peak summer pumping <br />m <br />G <br />G <br />November 2018 <br />Mitigation Plan Update - 2018 <br />00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.