Laserfiche WebLink
ITEM 17. WATER QUALITY: SURFACE WATER RUNOFF <br />2018 Update <br />The City will continue to work <br />to implement this measure. <br />The City will continue to work <br />to implement this measure. <br />.3 k <br />2%\ 02 <br />ct \ o �• .cn \ <br />cu b %; q \ <br />o. u _•— <br />o = <br />/ „ <br />z _ y 2 o <br />o %\ \ <br />/ k j k .§ \ <br />This activity has occurred and <br />will continue to occur. <br />2013 Update <br />Not addressed. <br />Not addressed. <br />§ <br />6. cu <br />6. <br />o 0 <br />0 <br />ct 2 <br />cu <br />•— : <br />. <br />ct o <br />/•— <br />This activity has occurred and <br />will continue to occur. <br />Mitigation Description <br />The City will assure that the developer(s) will design and <br />build the final drainage and runoff management system <br />within this overall framework, in compliance with the <br />mandates of the LRRWMO. <br />As part of the design process for BMPs, replacement of <br />non-native vegetation with native vegetation will occur <br />whenever practicable and desirable. <br />The City of Ramsey has submitted its draft application for <br />a Phase II National Pollutant Discharge Elimination <br />System (NPDES) permit. The unsigned permit was <br />submitted on March 10, 2003 under the MPCA <br />requirements for the program of the U.S. Environmental <br />Protection Agency (EPA). MPCA extended the timeline <br />for receipt of an officially signed permit so that the City <br />could authorize signature through a City Council action. <br />The new deadline for receipt of a signed application is <br />May 9, 2003. After that, the City will need to adopt a <br />Storm Water Pollution Prevention Program (SWPPP). <br />Since the City owns and operates a municipal drainage <br />system, it is subject to the provisions of the Municipal <br />Separate Storm Sewer System (MS4) provisions of the <br />law. Construction activities within the City, and <br />specifically on the Ramsey Town Center site, are also <br />subject to the Phase II General Storm Water Permit for <br />Construction Activity. <br />The City must identify best management practices (BMPs) <br />and measurable goals associated with each minimum <br />control measure noted above. The City will be given five - <br />Item No. <br />— <br />Q <br />N. <br />Q <br />m <br />Q <br />Q <br />November 2018 <br />Mitigation Plan Update - 2018 <br />