Laserfiche WebLink
Streets Work Plan <br /> 1. Continue storm water inspection system. (On-going) <br /> ~..')~.vw~,~T .......... Continue street maintenance performance evaluation program for seal coating and overlay <br /> projects in conjunction with Engineering. " <br /> 3. Continue to work with Public Works staff in Street Rating Program. <br /> ~ ~t ....Complete final year of 5-year plan to replace ali City street sig-ns with more <br /> 4. Ccntinu.~ ~ year t- <br /> visible street signs. <br /> ..... ,. .................. )'car cf fi:i: .prc~wam. <br />5. Implement third year of plan for upgrading metal building tbr year-round use. <br />6. Co::~'~:-::c'l .v;~::d,~:!l 3'~or~z~o ~roa ~:: :P F.z c:~;;:~:;3' ::!o:':.~' ::'i!!: o,~h,o;' ,'it,c i,'xF:'o:.'c:::c;?~','. (Coral)Icrc 2003) <br />7. Educate residents on plowing process and staking policy. (On-going) <br />8.. Complete moving mailboxes frore.cul-de-sacs.(95% completed in 2003) <br />9. License appropriate PW staff for the use of herbicides. (One staff member certified) <br />10. Continue OSHA/MNDOT training in equipment operation. (on-gOing) <br />1 l.Propose formal street sweePingpolicy to City Council including Town Center area. <br />12. investigate snow removal and storage options within the Town Ceriter area. <br /> <br /> Utilities Work Plan <br /> 1. Complete rate study and comprehensive water and sewer plans for Utilities. <br />2. Assure hydrant clearing and-inspection efforts during snow season. <br />3. Create a zone map tbr exercising water utility valves in preparation of dividing the task seasonally. <br /> <br /> ~r~;';:~:]OJ. Implement system to verij~ accuracy of tneter reading. <br />5. Evaluate an automaied water metenng sYstem program with Connexus Energy. <br />6. Communicate maintenance events to public prior.to activitY. (Website, Cable TV, et~.) (On-going) <br /> <br />Parks Work Plan <br />I. Develop public education on park and trail system through flyers and website. (complete but on-going) <br />2. .Continue maintenance in City cemeteries and develop entrance ~hrough City easement at Foster <br /> Cemetery. (in-progress) <br />3. Update maintenance plan for both trails and equipment as purchased or installed, Including an annual <br /> audit of trails for maintenance need~ the following year[ .$5000 annually to be utilized on priority basis. <br />4. Complete Master Trail Ptan after intra-agency review. (in-progress) ' ' <br /> <br />6. Update park and trail plan map. (complete and on-going) <br />7. Prepare concept plan [br area immediately west of Sunfish' Lake. <br />8. Prepare concept plan for Elmcrest.Park (complete) Establish additional'acceSs and complete constructio,. <br /> of/'~ phase of concept Plan. Continue to involve public safety. " <br /> <br />9. Implement 2004 Par/cs Capital !mprovemenl Plan. <br />10. ~ith the addition of the sidewalk maintenance machine; revisit ?ear-round maintenance of trails and <br /> wa/ks. <br />l 1. ~ith twitch'use gl'tree spade, znonitor lhe number of trees saved/relocatsd .to be compared ~o./~mtreyeans'. <br /> <br /> Public Works Department <br /> 1. Continue to cross-train staffto deal With day-to-day and emergency issues. <br /> 2. 14/ith Public &t./~ty establlxhing a Natzu'a~ Disaster Plan./hr the City. coordinal~ the respo~sibilities <br /> P~zb/ic Wor/c~' i;~ the plan, <br /> 3. Research education oppo~unities for specialized training. .. <br /> 4. Continue planning on Public Works:campus. Including administrative areas, wama vehicle/equipment <br /> storage, material stores area, on-Site nurse~, confiscated vehicle storage, etc. <br /> 5. Investigate a more Structured call-back system lbr operations. <br /> 6. h~ _304 cFl~ctjv~ly complete all utility inspections per schedul¢ pruvided bv Building <br /> <br />ictl~'n',lc, 5120i)4 O8./EC'FII/E.¥ ..IND IFORK PL..IN DRA 1"TLrew.ved. tltw <br /> <br /> <br />