My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Public Works Committee - 12/18/2018
Ramsey
>
Public
>
Minutes
>
Public Works Committee
>
2010 - 2019
>
2018
>
Minutes - Public Works Committee - 12/18/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 3:14:56 PM
Creation date
3/7/2019 8:58:39 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Public Works Committee
Document Date
12/18/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City Engineer Westby stated that in summary, traffic control is designed before construction is <br />complete and is therefore theoretical in nature, based on anticipated conditions. If changes are <br />made to traffic control after construction, the changes must account for actual conditions, which <br />requires further study. Bolton & Menk prepared the memo included in the case, which describes <br />all this in more detail. The memo also recommends completing an updated traffic study to <br />determine appropriate short and long-term traffic control options. Bolton & Menk can complete <br />this study in January at a cost not-to-exceed $3,000. <br /> <br />City Engineer Westby stated that the cost to remove a stop sign is approximately $200 per sign. <br />The cost for City Staff to fabricate and install a new sign is approximately $300 per sign. Staff <br />proposed to pay for all costs to study and/or modify the traffic control at this intersection as part <br />of City Improvement Project #18-05. He stated that staff recommends completing the traffic <br />study proposed by Bolton and Menk in January of 2019, and to present the findings to the Public <br />Works Committee in February of 2019 for further discussion and direction. <br /> <br />Chairperson Riley stated that what he heard is that the roads will continue to change, and the <br />study could be outdated once completed. <br /> <br />Councilmember Kuzma stated that he would not support doing anything right now. <br /> <br />Chairperson Riley stated that the neighborhoods are quickly developing and if something is done <br />now, it would be redone in a few years. He stated that it would be silly to remove the stop sign <br />only to place it back in a few years. <br /> <br />Civil Engineer IV Leonard Linton stated that the study would include vehicles, pedestrians and <br />bicycles and noted that January would not be the ideal month to capture all of that traffic. He <br />agreed that delaying the decision may be the better choice. <br /> <br />It was the consensus of the Committee to leave the stop sign as is for the time being. <br /> <br />6. COMMITTEE / STAFF INPUT (Continued) <br /> <br />6.02: Staff Updates on Improvement Projects and Items of Interest <br /> <br />City Engineer Westby provided an update on the difference in cost for an upcoming utility <br />project (LazyDays) which included an error, noting the original cost was proposed around <br />$450,000 and it actually closer to $750,000. He confirmed that there are sufficient funds <br />available in the trunk fund that will be used to fund that project. He noted that LazyDays will be <br />paying the winter construction costs and additional development will reimburse the City for the <br />cost of installing the utilities. <br /> <br />City Engineer Westby noted that the January Public Works Committee meeting has been <br />canceled as there is a conflict with the public meeting regarding road funding. <br /> <br />6.03: Review Future Topics Calendar <br />Public Works Committee / December 18, 2018 <br />Page 10 of 11 <br /> <br />