Laserfiche WebLink
Capital Improvement Program <br />City of Ramsey, Minnesota <br />2019 thru 2028 <br />Project# 17-IT-008 <br />P ojectName Universal Power Supply Replacement <br />Description <br />Total Cost $30,000 <br />Department Capital Equipment <br />Contact <br />Type Equipment <br />Useful Life 10 <br />Category Capital Equipment <br />Priority 3-Existing Obligation (Med) <br />Status Active <br />The Universal Power Supply, or UPS, at City Hall provided lightning protection and battery backup to the city's server room. In the event of a mass power outage, the UPS would sustain on - <br />premise city services for a limited time until generator power was available. <br />Justification <br />The current UPS went in when the Muncipal Center building was constructed in 2006, and based on research, the unit will no longer be serviceable after 2018. <br />New batteries will be installed in 2018 to last until the planned replacement year. <br />Expenditures 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 Total <br />Fumishings/Equipment 30,000 30,000 <br />Total <br />30,000 30,000 <br />Funding Sources 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 Total <br />General Fund 30,000 30,000 <br />Total <br />30,000 30,000 <br />42 <br />