Laserfiche WebLink
2001 Comprehensive Plan <br />Amended February 26, 2002 <br /> <br />The resultant 2020 average annual daily traffic forecasts (AADT) developed for principal <br />arterials, minor arterials, and collectors in Ramsey are shown in Table VI-3. <br /> <br />Table VI-3 Existing and Future Traffic Volumes <br /> <br /> 2020 Count 2020 Count <br />Location of Count Existing with future without future <br /> Count <br /> Bridge Bridge <br />Cry 83 s/o Cry 22 2,700 4,600 4,400 <br />Cty 83 n/o 153rd 5,100 9,000 9,900 <br />Cty 63 w/o Cty 5 1,100 1,300 1,900 <br />Cty 63 e/o Cty 5 1,300 6,000 4,100 <br />Cty 27 e/o TH 47 1,500 2,000 1,900 <br />TH 47 n/o Cty 27 4,800 12,200 10,500 <br />TH 47 n/o Cty 5 11,500 13,400 16,700 <br />TH 47 n/o Cty 116 16,600 13,700 20,400 <br />Cty 5 n/o 167th 4,700 10,700 6,900 <br />Cty 5 e/o Cty 5 4,100 4,400 6,000 <br />Cty 5 s/o 153rd 4,000 5,800 5,800 <br />Cty 56 n/o 149th 7,000 12,000 8,800 <br />Cty 56 n/o Sunwood 6,000 9,600 8,800 <br />Cty 57 n/o 153rd 1,500 1,200 3,800 <br />Cty 57 n/o US 10 6,100 2,400 8,700 <br />Cty 116 e/o Cty 56 2,400 11,100 5,000 <br />Cty 116 e/o Cty 57 4,100 13,100 10,100 <br />US 10 w/o Cty 83 24,000 38,400 38,300 <br />US 10 e/o Cty 83 31,100 42,900 44,700 <br />Future Bridge* NA 14,200 NA <br /> <br />* Traffic forecasts for bridge crossing are based on Anoka County's preferred bridge <br />alignment <br />Source: Anoka County 2015 Transportation plan extrapolated to 2020 by Benshoof and <br />Associates, Inc. <br /> <br />o <br /> <br />Adequacy of Roadway System in Year 2020 <br />To determine whether the arterials of the 2020 roadway system will adequately <br />accommodate the traffic volumes forecast for 2020, a comparison between the <br />forecast AADT and the capacity provided by each facility has been made. The daily <br />capacity calculations found in the Anoka County 2015 Transportation Plan were used <br />for this comparison and as the basis for assigning a LOS grade. <br /> <br />The 2020 forecasts for the base condition (no new Mississippi River bridge) indicate <br />that there will be capacity deficiencies on TH 10/169 along its entire length through <br />Ramsey by the year 2020. This segment of TH 10/169 will perform at LOS E at its <br />west end and at LOS F at its east end. No other capacity deficiencies are anticipated, <br />provided that the planned improvements to TH 47 are implemented (i.e. the ultimate <br />build recommendation of widening TH 47 from two lanes to four lanes). Without the <br /> <br />2001 Ramsey Comprehensive Plan <br />Amended February 26, 2002 <br /> <br />Page Fl-12 <br /> <br /> <br />