<br />The resultant 2020 average annual daily traffic forecasts (AADT) developed for principal
<br />arterials, minor arterials, and collectors in Ramsey are shown in Table VI-3.
<br />
<br />Table VI-3 Existing and Future Traffic Volumes
<br />
<br /> 2020 Count 2020 Count
<br />Location of Count Existing with future without future
<br /> Count
<br /> Bridge Bridge
<br />Cry 83 s/o Cry 22 2,700 4,600 4,400
<br />Cty 83 n/o 153rd 5,100 9,000 9,900
<br />Cty 63 w/o Cty 5 1,100 1,300 1,900
<br />Cty 63 e/o Cty 5 1,300 6,000 4,100
<br />Cty 27 e/o TH 47 1,500 2,000 1,900
<br />TH 47 n/o Cty 27 4,800 12,200 10,500
<br />TH 47 n/o Cty 5 11,500 13,400 16,700
<br />TH 47 n/o Cty 116 16,600 13,700 20,400
<br />Cty 5 n/o 167th 4,700 10,700 6,900
<br />Cty 5 e/o Cty 5 4,100 4,400 6,000
<br />Cty 5 s/o 153rd 4,000 5,800 5,800
<br />Cty 56 n/o 149th 7,000 12,000 8,800
<br />Cty 56 n/o Sunwood 6,000 9,600 8,800
<br />Cty 57 n/o 153rd 1,500 1,200 3,800
<br />Cty 57 n/o US 10 6,100 2,400 8,700
<br />Cty 116 e/o Cty 56 2,400 11,100 5,000
<br />Cty 116 e/o Cty 57 4,100 13,100 10,100
<br />US 10 w/o Cty 83 24,000 38,400 38,300
<br />US 10 e/o Cty 83 31,100 42,900 44,700
<br />Future Bridge* NA 14,200 NA
<br />
<br />* Traffic forecasts for bridge crossing are based on Anoka County's preferred bridge
<br />alignment
<br />Source: Anoka County 2015 Transportation plan extrapolated to 2020 by Benshoof and
<br />Associates, Inc.
<br />
<br />o
<br />
<br />Adequacy of Roadway System in Year 2020
<br />To determine whether the arterials of the 2020 roadway system will adequately
<br />accommodate the traffic volumes forecast for 2020, a comparison between the
<br />forecast AADT and the capacity provided by each facility has been made. The daily
<br />capacity calculations found in the Anoka County 2015 Transportation Plan were used
<br />for this comparison and as the basis for assigning a LOS grade.
<br />
<br />The 2020 forecasts for the base condition (no new Mississippi River bridge) indicate
<br />that there will be capacity deficiencies on TH 10/169 along its entire length through
<br />Ramsey by the year 2020. This segment of TH 10/169 will perform at LOS E at its
<br />west end and at LOS F at its east end. No other capacity deficiencies are anticipated,
<br />provided that the planned improvements to TH 47 are implemented (i.e. the ultimate
<br />build recommendation of widening TH 47 from two lanes to four lanes). Without the