Laserfiche WebLink
2001 Comprehensive Plan <br />Amended February 26, 2002 <br />Annually monitor sewer flowage into the two metropolitan interceptors in <br />order to identify infiltration and inflow (I&I) problems, which can cost- <br />effectively be repaired. <br /> <br />Work with the Metropolitan Council Environmental Services division to <br />identify any points of major I&I into the system and devise a plan to minimize <br />future I&I. <br /> <br />Emphasize prevention and education to protect against ground water pollution <br />related to on-site sewage disposal systems. <br /> <br />Ensure existing on-site sewage disposal systems in the City are consistently <br />maintained and monitored as required under Minnesota Rules Section 7080. <br /> <br />Figure VIII-1 Existing and Future Sanitary Sewer Plan <br /> <br />Future Sanitary <br />Sewer System <br />Draft <br /> <br />~ Hoishl~tonKoegler Group,It~¢. <br /> <br />2001 Ramsey Comprehensive Plan <br />Amended February 26, 2002 <br /> <br />Page VIII-5 <br /> <br /> <br />