My WebLink
|
Help
|
About
|
Sign Out
Home
08. Sewer Element
>
Comprehensive Plan
>
Comprehensive Plan (old)
>
2000-2009
>
2002
>
08. Sewer Element
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 2:55:05 PM
Creation date
3/1/2005 1:37:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2001 Comprehensive Plan <br />Amended February 26, 2002 <br />Annually monitor sewer flowage into the two metropolitan interceptors in <br />order to identify infiltration and inflow (I&I) problems, which can cost- <br />effectively be repaired. <br /> <br />Work with the Metropolitan Council Environmental Services division to <br />identify any points of major I&I into the system and devise a plan to minimize <br />future I&I. <br /> <br />Emphasize prevention and education to protect against ground water pollution <br />related to on-site sewage disposal systems. <br /> <br />Ensure existing on-site sewage disposal systems in the City are consistently <br />maintained and monitored as required under Minnesota Rules Section 7080. <br /> <br />Figure VIII-1 Existing and Future Sanitary Sewer Plan <br /> <br />Future Sanitary <br />Sewer System <br />Draft <br /> <br />~ Hoishl~tonKoegler Group,It~¢. <br /> <br />2001 Ramsey Comprehensive Plan <br />Amended February 26, 2002 <br /> <br />Page VIII-5 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.