Laserfiche WebLink
Community Development DireCtor Trudgeon advised that the need for structured parking within <br />the Town Center was identifieit early ~ the planning process as being critical. He stated the <br />utilization of parking structur0s, while ~OstlY, will dramatically reduce the need for surface <br />parking in the Town Center Cote and allOW for buildings to be dense and vertical. He stated the <br />use of parking structures also provides fo~ a mOre pedestrian friendly experience in the core. <br /> <br />Community Development Director Tmdge°n mentioned that as with-City Hall, this parking ramp <br />has not been fully decided by the City Cotmeil. ~ He indicated he would also mention that the City <br />received $2.2 million from the Metropolitan COUncil for this project. <br /> <br />Community Development Director Trudgeon iadvised that along Sunwood Drive the Ramsey <br />Town Center plan shows a commercial r~tail building, on a separate lot in front of the parking <br />structure. He noted that once the new I°t is created, the parking structure will no longer have <br />direct frontage onto Sunwood Drive. He ihdieated at this point it is uncertain when this structure <br />will be built, but Staff believes' ': ..... <br /> ~t, wilt oee~ w~thin the next two years. <br /> <br />Assistant Community Development DireCtor Trudgeon stated Staff believes that the 0-5 foot <br />front yard setback for the TC-1 District should not apply to the municipal parking structure since <br />it is an accessory use and the fact that a new lot will be created in front of the parking structure <br />and thus removing the frontage oflthe building from Sunwood Drive. <br /> <br />Community Development DirectOr Trudgeon advised that the Town Center Technical Advisory <br />Committee met on January 12, 2005 to re~ieW the architecture of the building. He stated that in <br />general, the TCTAC liked the building; recognizing its utilitarian uSe. He indicated they like the <br />look of the 'warehouse' style and thought;it was appropriate. He noted the structure will consist <br />of precast concrete infill panels placed between :columns. He indicated cultured stone will be <br />used on the first level to provide for a more~ pleasing aesthetic at the ground level. He added the <br />most prominent feature of the strUcture will belthe glass stairwells, which will be prominently <br />placed at the comers of the structure. He indicated that besides serving a functional purpose, <br />they will also be a focal point of t~ structure, especially at night when the stair wells are lit up. <br /> <br />Commissioner Shepherd asked if the parking ramp would be free. <br /> <br />Assistant Community Development DireCtor TrUdgeon indicated it would be a free ramp. <br />Commissioner Shepherd asked if the th~atre being proposed was a movie theatre or a live theatre <br /> <br />venue. <br /> <br />Assistant Community Development DirectOr Trudgeon indicated a multi-screen movie theatre is <br />being proposed. <br /> <br />Joann Alsmith talked about the diStdbution of parking and how the location was determined. <br />She stated this will also be a park aUd ride location, and can accommodate a transit station for the <br /> <br />Planning commission/February 3, 2005 <br /> page 13~Of 15 <br /> <br /> . <br /> <br /> <br />