My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/26/2019
Ramsey
>
Public
>
Agendas
>
Council
>
2019
>
Agenda - Council - 03/26/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:26:31 PM
Creation date
3/22/2019 9:22:55 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/26/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br />-, -.1‘11,- <br />1 1111N = <br />MIDL 1 . <br />I _ .____ _ __ 1 <br />_ I rni.___ <br />Hui- <br />maw <br />Street Widths and Design [section modified from Sketch Plan Review] <br />The proposed street widths are shown at twenty-nine (29) feet. Traditional City Streets in <br />Ramsey are measured at thirty-two (32) foot widths. These street widths were already approved <br />with the previous Preliminary Plat. <br />A Street Light Plan must be created and submitted to the City for review. The City will work <br />with Connexus Energy to determine the final, appropriate Street Light Plan. <br />Development Fees <br />Standard Development Fees are due on the plat. The Developer has entered into a Master Park <br />Dedication and Trail Development Fee Agreement guiding satisfaction of these fees. <br />Standard Development Fees are due on the plat at time of recording of the Final Plat. The fees <br />will be collected at the rate in effect at time of recording of the plat for buildable lots. <br />• Water Trunk/Connection <br />• Sanitary Sewer Trunk/Connection <br />• Stormwater Management <br />Environmental Review <br />An Environmental Assessment Worksheet (EAW) is mandatory by the State of Minnesota for <br />this project as was previously accepted as adequate with the original Preliminary Plat approval. <br />It is our mission to work together to responsibly grow our community, and to provide quality, cost-effective and efficient government <br />services. <br />Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.