Laserfiche WebLink
ProjectDox <br />Changemarks Report <br />(Unresolved <br />Unresolved Civil Engineer <br />False Unresolved <br />Unresolved <br />ivtl Engineer <br />ivH Engineer <br />5_6080 Hwy 10_Grade.pdf LL <br />5_6080 Hwy 10_Grade.pdf <br />5_6080 Hwy <br />0_Grade <br />Lot and Block Tabulation <br />required <br />Min®num slope <br />SWPPP <br />A lot and block tabulationls 02/27/2019 1:54 PM <br />required shoring the floor <br />elevation, lowest floor <br />elevation, 100 year flood <br />elevation and emergency <br />overflow elevation Of <br />applicable). <br />The minima= floor elevation 02/27/2019 1:54 PM Len Linton <br />must meet Lower Rum River <br />Watershed Management <br />orgainzations rules as noted <br />below: <br />Len Linton <br />The lowest floor elevation of <br />all development, including <br />basements, must be at least <br />3 feet above the highest <br />anticipated ground water <br />table, 2 feet above the <br />designated or designed 100- <br />year flood <br />elevation, or 1 foot above <br />the emergency overflow, <br />whichever is higher. <br />The minimum slope is 2% on 02/27/2019 <br />all pervious surfaces. Spot <br />elevatoins must be added at <br />all lot corners <br />reference the The SWPPP was submitted 02/27/20 <br />in letter format. It must be <br />referenced on the plan <br />sheets. <br />Add a note that a sweeper 102/27/2019 1 54 PM <br />must be on site or available <br />within 3 hours notifcation <br />from City that street <br />sweeping is required. <br />The SWPPP states a 100 02/27/20 <br />foot buffer from the river is <br />required. The buffer must <br />be shown on the plans and <br />added to the legend. <br />Street Sweeping <br />Buffer <br />Len Linton <br />