Laserfiche WebLink
ProjectDox <br />Changemarks Report <br />Fake <br />Unresolved <br />Civil Engineer <br />_SYMAP.pdf <br />LL <br />Revise Infiltration , The HydroCAD proposed <br />Calculations condition shows 4.69 acres <br />of pervious and 2.21 acres <br />of impervious. This differs <br />from the information <br />presented above. The <br />02/27/2019 11:28 AM <br />Len Linton <br />HydroCAD information along <br />with the infiltration basin <br />elevation information was <br />input into the MIDS3 <br />calculator. An infdlration <br />rate of 0.8in/hr (SP soils) <br />was used. <br />The basin with the overflow <br />set at 1 foot provides 88 % <br />Volume reduction, TP and <br />TSS. Interpolating the area <br />difference from 1 foot to 3 <br />feet and using an overflow <br />depth of 1.5 feet, the pond <br />will provide 100 % volume <br />reduction and 96% TP and <br />TSS reduction. <br />Please revise the elevation <br />of the splitter wier. <br />False Unresolved City Planner 4_6080 Hwy 10_Site.pdf <br />= <br />(-. Noe Sidewalk Required Sidewalk required on one 02/25/2019 12:02 PM Chloe McGuire Bn'� <br />side of road: staff <br />reepmmenrffiwouth side of <br />False <br />Unresolved <br />Environmental Review <br />'6_6080 Hwy 10_Details.pdf <br />CA Tree Planting Detail .Add detail for tree planting 02/21/2019 12.02 PM Chris Anderson <br />either on this sheet or with <br />'� <br />'the Landscape Plan. <br />