My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/26/2019
Ramsey
>
Public
>
Agendas
>
Council
>
2019
>
Agenda - Council - 02/26/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:23:20 PM
Creation date
3/22/2019 10:45:08 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/26/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
656
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM 17. WATER QUALITY: SURFACE WATER RUNOFF <br />Item No. <br />Mitigation Description <br />2013 Update <br />2018 Update <br />17.1 <br />The City will assure that the developer(s) will design and <br />build the final drainage and runoff management system <br />within this overall framework, in compliance with the <br />mandates of the LRRWMO. <br />Not addressed. <br />The City will continue to work <br />to implement this measure. <br />17.2 <br />As part of the design process for BMPs, replacement of <br />non-native vegetation with native vegetation will occur <br />whenever practicable and desirable. <br />Not addressed. <br />The City will continue to work <br />to implement this measure. <br />17.3 <br />The City of Ramsey has submitted its draft application for <br />a Phase II National Pollutant Discharge Elimination <br />System (NPDES) permit. The unsigned permit was <br />submitted on March 10, 2003 under the MPCA <br />requirements for the program of the U.S. Environmental <br />Protection Agency (EPA). MPCA extended the timeline <br />for receipt of an officially signed permit so that the City <br />could authorize signature through a City Council action. <br />The new deadline for receipt of a signed application is <br />May 9, 2003. After that, the City will need to adopt a <br />Storm Water Pollution Prevention Program (SWPPP). <br />Since the City owns and operates a municipal drainage <br />system, it is subject to the provisions of the Municipal <br />Separate Storm Sewer System (MS4) provisions of the <br />law. Construction activities within the City, and <br />specifically on the Ramsey Town Center site, are also <br />subject to the Phase II General Storm Water Permit for <br />Construction Activity. <br />This activity has occurred and <br />will continue to occur. <br />The City of Ramsey applied for <br />the new NPDES permit that is <br />currently under development by <br />the MPCA. The City will fully <br />implement the conditions of the <br />new permit when it is issued. <br />17.4 <br />The City must identify best management practices (BMPs) <br />and measurable goals associated with each minimum <br />control measure noted above. The City will be given five- <br />This activity has occurred and <br />will continue to occur. <br />This activity has occurred and <br />will continue to occur. <br />11 <br />Mitigation Plan Update - 2018 <br />November 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.