Laserfiche WebLink
CITY OF RAMSEY <br />GATEWAY <br />Ramsey Blvd Preliminary Costs <br />AINA elm <br />--Ea County <br />GREATER MN t,; DEPARTMENT OF <br />■ ■ TRANSPORTATION <br />Ramsey Over Cost Estimates <br />Construction <br />Right -of -Way <br />Engineering <br />TOTAL <br />Option 2. Tight Diamond <br />$34 <br />- $38 M <br />$16 <br />- $18 M <br />$6.8 <br />- $7.6 M <br />$58 <br />- $64 M <br />Option 4. Folded WB TH 10 Off <br />$30 <br />- $34 M <br />$16 <br />- $18 M <br />$6.1 <br />- $6.7 M <br />$52 <br />- $58 M <br />Option 7A. RIRO <br />$23 <br />- $25 M <br />$18 <br />- $20 M <br />$4.6 <br />- $5.0 M <br />$46 <br />- $51 M <br />Option 7B. RIRO <br />$27 <br />- $30 M <br />$16 <br />- $18 M <br />$5.5 <br />- $6.0 M <br />$49 <br />- $54 M <br />Option 9. Tight Diamond with <br />W Frontage Rd <br />$41 <br />- $45 M <br />$12 <br />- $13 M <br />$8.2 <br />- $9.0 M <br />$61 <br />- $67 M <br />