Laserfiche WebLink
Anoka County Improvement Projects <br />• Foley Boulevard/CSAH 11 Grade Separation @ BNSF Railway Crossing <br />• Project is currently unfunded <br />• Roundabout at Armstrong Boulevard/CSAH 83 and Alpine Drive <br />• Anoka County was awarded $1.35M in Highway Safety Improvement Program funding (estimated <br />project cost = $1.5M) <br />• Local cost share (Anoka County and City of Ramsey) = $150,000 <br />• City of Ramsey costs set per Anoka County Cost Share Policy <br />• Anoka County plans to begin project design efforts in 2019/2020 <br />• Construction planned for 2022/2023, pending City and County approvals <br />MnDOT Improvement Projects <br />• Ferry Street / Trunk Highway 47 Grade Separation @ BNSF Railway Crossing (2017) <br />• Preliminary design still on hold <br />• MnDOT is exploring the potential realignment of Highway 47 to remove the S-curve at the Anoka <br />County fair grounds <br />• Ramsey Staff is continuing to track this project <br />• MnDOT is considering combining with planned Highway 10 improvements <br />Items of Interest <br />. Northwest Metro Surface Water Supply Feasibility Study <br />• City participants include Corcoran, Dayton, Ramsey and Rogers <br />• Short Elliott Hendrickson (SEH) was selected to complete the study <br />• Meet with SEH next week to discuss desired study content and outcomes <br />Timeframe: <br />Staff estimates 5 minutes will be needed for updates and discussion. <br />Observations/Alternatives: <br />NA <br />Funding Source: <br />NA <br />Recommendation: <br />NA <br />Action: <br />No formal action required. For Committee review and discussion purposes only. <br />No file(s) attached. <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Grant Riemer Grant Riemer 03/12/2019 11:44 AM <br />Kurt Ulrich Kurt Ulrich 03/12/2019 12:40 PM <br />Form Started By: Bruce Westby Started On: 03/12/2019 10:18 AM <br />Final Approval Date: 03/12/2019 <br />