My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/09/2019
Ramsey
>
Public
>
Agendas
>
Council
>
2019
>
Agenda - Council - 04/09/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:27:29 PM
Creation date
4/22/2019 4:17:01 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/09/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
$607,144.11 and authorized the Mayor and City Administrator to enter into a construction contract with Kuechle <br />Underground. <br />Construction began in mid -March. As work progressed, the contractor approached the intersection of Riverdale <br />Drive and Armstrong Boulevard while installing sanitary sewer and discovered that the pay items in the plans and <br />specifications had not been revised after utilities were realigned to account for higher ground elevations and the <br />resulting increased fill depths over the top of the sanitary sewer. Per the plans, sanitary sewer construction was to be <br />paid by 2 foot bury depth increments, with the greatest bury depth listed as 14 to 16 feet. During construction it was <br />observed that 200 linear feet of sewer would be installed where the bury depth would range between 16 and 20 feet, <br />requiring a new pay item. In addition, realigning the utilities required the removal of additional trees. This work is <br />covered in Change Order 1. <br />As work progressed further, an existing 27 inch storm sewer line was found to be running nearly parallel between <br />the new trunk utilities, which was slightly different from what the plans showed. This required 150 feet of the 27 <br />inch storm sewer to be salvaged (removed but saved) while the new utilities were installed at a lower elevation, <br />then installed again after the trunk utilities were constructed. This work is covered in Change Order 2. <br />Construction will be complete April 5, 2019. Testing of utilities will be completed within 30 days. <br />Notification: <br />No notifications are required. <br />Observations/Alternatives: <br />Observations: <br />Copies of Change Orders 1 and 2 are attached with the Contractors signatures accepting the change orders, and the <br />City Engineer's signatures recommending approval of the change orders. The work covered by these Change <br />Orders has already been completed in order to stay on schedule. A 2 day extension is also included with Change <br />Order 1. <br />If plans had been modified to add pay items for 16 to 20 foot depth sanitary sewer bury, the additional tree <br />removals, and the new 27 inch storm sewer salvage and install pay item, bid prices would have reflected these <br />items increasing construction costs accordingly. <br />Alternatives: <br />Alternative # 1 — Motion to adopt Resolution 19-089 approving Change Orders 1 and 2 for Riverdale Drive Trunk <br />Utility Improvements, Improvement Project 18-14. <br />Funding Source: <br />Payment for the work covered by Change Order 1 and 2 will be paid for through the sewer and water enterprise <br />funds, similar to the rest of the work completed with this project. <br />Recommendation: <br />City staff recommends Alternative # 1. <br />Action: <br />Adopt Resolution 19-089 approving Change Orders 1 and 2 for Riverdale Drive Trunk Utility Improvements, <br />Improvement Project 18-14. <br />Attachments <br />Resolution 19-089 <br />Change Order 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.