My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 04/16/2019
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2019
>
Agenda - Public Works Committee - 04/16/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:22:58 AM
Creation date
4/24/2019 10:47:10 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
04/16/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-EIBBSB-6 <br />-'N' GA‘v.a,(, -FILTRATION a� GROUND of <br />PRE3SU <br />THE SOILS <br />BASIN FROM EROSION <br />3 REMOVE ALL <br />BELOW BASE F p)�I WITH LOOSE <br />PLACED SA <br />SB-7 <br />EAST INFILTRATION BASIN <br />LOWEST ELEV. 859.8 88,444 SF <br />MAXIMUM WATER ELEV. 863.0 114,829 SF <br />MAXIMUM DEPTH 3.2 FT <br />MAXIMUM VOLUME <br />n A a LF,EITENTION POND <br />E., HEETS XXX-XXZ FOR <br />) <br />4` )m)ie <br />aaw 8-09 <br />CITY OF Y <br />7550 SUN WOOD DRIVE <br />6ea) a2Ri- a10 FAX (763) 466s898 <br />8 <br />GRADING PLAN EAST <br />>—» PROPOSED STORM PIPE <br />C) PROPOSED STORM STRUCTURE. <br />LEGEND <br />PROPOSED SOIL BORING <br />FUTURE I ET CONTOUR <br />— FUTURE 5 FOOT CONTOUR <br />EXISTING I ET CONTOUR <br />EXISTING 5 FOOT CONTOUR <br />PROPOSED I FOOT CONTOUR <br />PROPOSED 5 FOOT CONTOUR <br />X 8598 PROPOSED SPOT ELEVATION <br />—sue SILT FENCE <br />COR INFILTRATION BASIN IMPROVEMENTS <br />CITY PROJECT NO.E18-09 <br />OTY OF RAMSEY, MINN <br />rY28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.