Laserfiche WebLink
CITY OF RAMSEY LAND USE APPLICATION <br />TECHNICAL REVIEW FILE <br />DATE <br />MARCH 28, 2019 <br />PROJECT ADDRESS <br />LOT 1 BLOCK 1 COR <br />PARKVIEW ADDITION <br />PROJECT. <br />SAPPHIRE — FINAL PLAT AND SITE PLAN <br />TITLE <br />ESCROW # <br />DEPARTMENT: <br />Community Development: Planning Division (Zoning Code) <br />TECHNICAL <br />REVIEWER: <br />Name: Eric Maass <br />Phone: (763) 576-4306 <br />Email: EMaass@CityofRamsev.com <br />We offer the following comments regarding the Final Plat and Site Plan submittal for COR Sapphire Addition <br />as it relates to the City's Zoning Code. Final Plat and Site Plan submittal consists of fifteen (15) sheets, prepared <br />by Hakanson Anderson and dated 02.28.2019 and was received by the City of Ramsey on 02.28.2019. Staff has <br />determined the application is complete. <br />Completeness Check <br />Requirements <br />Included? <br />Final Plat Sheet <br />Yes <br />Existing Conditions <br />Yes (C5) <br />Grading, Drainage, and Erosion <br />Control Plan <br />Yes (C6) <br />Street Plan <br />No separate sheet <br />Utility Plan <br />Yes (C7) <br />Construction Details <br />Yes (C4) <br />Landscape Plan/Tree <br />Preservation Plan <br />Yes (L1, L2) <br />Site Plan <br />Yes <br />Architectural Rendering <br />Yes <br />Floor Plan <br />Yes <br />Summary of Required Changes <br />1. Provide architectural rendering for the west facing side of the structure adjacent to Center Street and <br />the architectural rendering for the eastern facing portion (portion that faces the parking lot). <br />2. Provide percentage of each exterior building materials not including glazed glass area (windows/doors). <br />3. Remove individual air conditioning units shown for each unit that show on the architectural floor plans <br />but are not represented on the architectural elevations. <br />4. Amend sidewalk design to 10 feet in width along Center Street consistent with the west side of Center <br />Street, and label as `final design and construction by others'. You will not be responsible for <br />construction of sidewalks along Center Street; however, you will be responsible for 20% of the costs <br />of the final construction of Center Street as defined by the Bolton and Menk Study available upon <br />request. <br />