Laserfiche WebLink
Anoka County Improvement Projects <br />. Roundabout at Armstrong Boulevard/CSAH 83 and Alpine Drive <br />• Anoka County received $1.35M in HSIP funds (est. project cost = $1.5M) <br />• Local cost share (Anoka County, City of Ramsey) = $150,000 <br />• City of Ramsey costs set per Anoka County Cost Share Policy <br />• Anoka County to begin project design efforts in 2019/2020 <br />• Construction planned for 2022/2023 pending City and County approvals <br />MnDOT Improvement Projects <br />• Ferry Street / Trunk Highway 47 Grade Separation @ BNSF Rail Crossing <br />• Preliminary design on hold <br />• MnDOT is exploring potential realignment of Highway 47 to remove S-curve at Anoka County fair <br />grounds <br />• Staff communicated the comment made at the April 3rd Strategic Planning Meeting that Ramsey wants <br />to be involved with traffic studies due to obvious impacts to the City of Ramsey. <br />• MnDOT is considering combining this project with planned Highway 10 improvements <br />Items of Interest <br />• 17290 Germanium Street Drainage Concerns <br />• November 13, 2018 - Owner addressed City Council with drainage concerns <br />• December 18, 2018 - Owner presented concerns to Public Works Committee <br />• Late December 2018 - Staff collected topo on west property edge per Public Works Committee <br />direction <br />• March 5, 2019 - Staff emailed updates to owner <br />• Late March 2019 - Owner submitted invoice to City for frozen septic system <br />• Early April 2019 - Staff collected topo on south property edge <br />• April 10, 2019 — Staff emailed updates to owner <br />• Late April 2019 - Staff will mail letter to owner summarizing analysis and next steps <br />• Spring/summer 2019 - Covenant Meadows developer will install two 8-inch driveway culverts and <br />regrade driveway <br />• Northwest Metro Surface Water Supply Feasibility Study <br />• City participants include Corcoran, Dayton, Ramsey and Rogers <br />• Short Elliott Hendrickson (SEH) is completing the study <br />• Completion of the study should occur in late 2019/early 2020 <br />• JPA for Signal System at CSAH 5/Nowthen Boulevard and 170th Avenue <br />• Anoka County submitted a draft JPA for the new signal system <br />• Ramsey City Attorney is reviewing draft JPA <br />• Anoka -Hennepin Independent School District # 11 is reviewing draft JPA <br />• JPA will be presented to City Council for approval in April/May 2019 <br />• Signal system construction scheduled for summer 2019 <br />Timeframe: <br />Staff estimates 5 minutes will be needed for updates and discussion. <br />Observations/Alternatives: <br />NA <br />Funding Source: <br />Based on discussions. <br />Recommendation: <br />