My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/14/2019
Ramsey
>
Public
>
Agendas
>
Council
>
2019
>
Agenda - Council - 05/14/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:29:15 PM
Creation date
6/17/2019 4:24:16 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/14/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOLTON <br />& MENK <br />Real People. Real Solutions. <br />April 16, 2019 <br />Bruce Westby, P.E. <br />City Engineer <br />7550 Sunwood Drive NW <br />Ramsey, MN 55303 <br />7533 Sunwood Drive NW <br />Suite 206 <br />Ramsey, MN 55303-5119 <br />Ph: (763) 433-2851 <br />Fax: (763) 427-0833 <br />Bolton-Menk.com <br />RE: Proposal for Construction Staking Services <br />City of Ramsey Improvement Project #19-03, Wood Pond Hills & Chestnut Ridge <br />Dear Mr. Westby: <br />We appreciate the opportunity to assist the City of Ramsey with the construction survey for the above <br />referenced project. We have reviewed the April 4, 2019 plans for the project. <br />We understand the staking will occur on an as -needed basis. If staking is needed, we have assumed the <br />following: <br />• We will be supplied with existing control that was used for the topographic survey, <br />• We will be supplied with AutoCAD files of the design, including alignments, and <br />• We will be supplied with the existing topographic survey files, to allow for staking the curb for <br />reinstatement, if needed. <br />Bolton & Menk proposes to perform any requested staking based on the rates presented in the <br />following table: <br />Personnel Rate/Hr <br />Licensed Surveyor $120.00 <br />Survey Technician $100.00 <br />Survey Crew Chief $115.00 <br />No additional fees for stakes, mileage, equipment, etc. will be invoiced to the City, but are included in <br />our hourly rates. The rates above are valid through the 2019 construction season. <br />If there are any questions, please call me at (651) 968-7760. <br />Sincerely, <br />BOLTON & MENK, INC. <br />Kevin P. Kielb, P.E. <br />Principal Engineer <br />C:AUsers\kevinki\DesktopA20t 9 Construction Staking Proposals\Ramsey - 2019 - 19-03\Ramsey 2019 Construction Stakine.docx <br />Bolton & Menk is an equal opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.