Laserfiche WebLink
CH <br />LOCATION <br />SHEETS No. 6 <br />SHEETS No. 10 <br />SHEETS No. S - 9 <br />CONTROL DETAILS SHEETS No. 4 <br />CONTROL QUANTITIES: <br />QUANTITY <br />235 LF <br />1 EA. <br />20 EA. <br />❑NIERSITY(1r MINNESOTA Erosion and Stormwater <br />Management <br />Joe Feriancek <br />a, SWWPP(May 31 mz0) <���.ro,..m wuru .�... �°"• <br />FORD BROOK ESTATES STREET RECONSTRUCTIONS <br />CITY PROJECT NO. 19-01 <br />CITY OF RAMSEY, MINNESOTA <br />,d area) = 1.15 acres <br />s surface = 0.64 acres <br />mpervious surface = 0.64 acres <br />rea created = 0.00 acres <br />:date: June 2019 <br />pletion date: September 2019 <br />tip: 32 Range: 25 Section: 2 Latitude: 45.2980 Lo <br />ER MANAGEMENT SYSTEM: <br />agement used if more than 1 acre of new impervious surface <br />nd <br />r Management Not Required <br />QUIREMENTS IN PROJECT PLAN: <br />DESCRIPTION <br />ONTROL MEASURES <br />DESCRIPTION <br />N HOLE <br />/ERT <br />J <br />w <br />n�wn°z <br />= o <br />v �? z <br />v E <br />nn n <br />a <br />F 2 <br />O <br />O <br />z w <br />¢ <br />> ¢ <br />� <br />u n <br />Type of storm water man <br />a. Wet Sedimentation Po <br />b. Infiltration / Filtration <br />c. Regional Pond <br />d. Permanent Stormwate <br />LOCATION OFSWPPP RE <br />TEMPORARY EROSION C <br />FINAL STABILIZATION <br />STORM SEWER TABULATI <br />EROSION AND SEDIMENT <br />EROSION AND SEDIMENT <br />SILT FENCE TYPE MS <br />INLET PROTECTION - MA <br />INLET PROTECTION - CUL <br />CERTIFICATION: <br />1 <br />- <br />- <br />3 3 <br />- <br />1 <br />SWPPP- NOTES <br />— <br />HEDULE AND PHASING: <br />rimeter sediment control and inlet protection. <br />bituminous street. <br />:uminous pavement. <br />Iporary BMP's as necessary during construction based on inspection reports. <br />=_rmination (NOT) to MPCA within 30 days of final stabilization. <br />t ensure final stabilization of the site. The permittee(s) must submit a NOT within 30 <br />zation is complete, or another owner/operator (permittee) has assumed control over <br />tick have not undergone final stabilization. Final stabilization can be achieved in one of <br />(ctivities at the site have been completed and all soils must be stabilized by a uniform <br />ie cover with a density of 70 percent over the entire pervious surface area, or other <br />tecessary to prevent soil failure under erosive conditions and; <br />s, constructed to drain water from the site after construction is complete, must be <br />de erosion; <br />hetic, and structural erosion prevention and sediment control BMP's (such as silt <br />removed as part of the site final stabilization; and <br />lust clean out all sediment from conveyances and from temporary sedimentation <br />s permanent water quality management basins. Sediment must be stabilized to <br />being washed back into the basin, conveyances or drainage ways discharging off -site <br />rters. The cleanout of permanent basins must be sufficient to return the basin to design <br />ver shall be in the Project Specifications. <br />struction only, final stabilization has been achieved when temporary erosion protection <br />: perimeter control for individual lots has been completed and the residence has been <br />homeowner. Additionally, the permittee must distribute the MPCA "Homeowner fact <br />!owner to inform the homeowner of the need for, and benefits of, final stabilization. <br />JTAL CONSIDERATIONS: <br />USEPA APPROVED <br />TMDL? <br />RUM RIVER RIVER YES YES YES <br />IMPAIRMENTS: NOT FOR CONSTRUCTION, MERCURY AND FISH CONSUMPTION <br />E <br />o <br />E <br />FLOWS TO <br />IMPAIRED WATER <br />WITHIN 1 MILE? <br />CITY OF RAMSEY <br />City 0� 7550 SUNWOOD DRIVE <br />" ^ nA`EY RAMSEY, FAXMN <br />1�!]LVl J 1 (763) 427-1410 FAX (763) 433-9898 <br />d in Part 15 of the permit for the design o1 <br />,en included in the preparation of this SWPP <br />unt, frequency, intensity and duration of pre <br />nwater runoff and run-on at the site. <br />Id stormwater volumes to minimize erosio <br />in. <br />article sizes expected to be present on the si <br />uding surface water, wetlands, Public Wate <br />d map within 1 mile of the project bounda <br />are listed as follows. All specific BMP's rel. <br />impaired waters have been incorporatec <br />those BMP's listed for construction relat <br />E. <br />r <br />w <br />E <br />TYPE (DITCH, POND, <br />WETLAND, LAKE, <br />ETC.) <br />E o <br />2. <br />o <br />i <br />E <br />3 <br />8 <br />NAME OF WATER <br />BODY <br />A2 <br />_- <br />A. <br />A. <br />Q0F V E v <br />W <br />W Y <br />Ikk ,. <br />- o E? <br />c n <br />3 w : <br />v <br />a A <br />ohm <br />(44 <br />`aa <br />= <br />ga R i +�, <br />o 3 E 3 <br />a <br />N 3 <br />i� <br />jial.jigin11►l. <br />v <br />- <br />= <br />i <br />al Milt <br />ude; Site Grading, Storm Sewer Construct <br />tion, and Permanent Stabilization. <br />construction of 0.16 miles of existing bit <br />street to the existing width and grade, with <br />tg street flows to drainage swales to the n <br />the north. The construction will include th. <br />nor improvements will be made to the do <br />Ige to the outfall location of the storm wat <br />r must apply for coverage under the MF <br />quired by the National Pollution Discharg <br />:he permit will begin automatically 7 caler <br />rked date of a complete application. (Lc <br />arge within 1 mile of a special water). <br />U <br />3 <br />m <br />3 <br />m <br />- v-_ <br />= 2 _ v- <br />STORM WATER POLLUTI( <br />PREVENTION PLAN (SWPI <br />FORD BROOK ESTATES STREE <br />RECONSTRUCTIONS <br />CITY OF RAMSEY <br />ANOKA COUNTY, MINNESO1 <br />1ESCRIPTION OF CONSTRUCTION ACTIVITIES AND ST( <br />U <br />= cy <br />o <br />a <br />0 3 o <br />STIE MANAGER: <br />PARTY RESPONSIBLE FOR <br />LONG TERM O&M: <br />'o — - - <br />oN omo ���3o,=v <br />E - <br />ouu n-—.,o ua-D-D mm�vu_ nomnuv nini4 ,no <br />