My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/14/2019
Ramsey
>
Public
>
Agendas
>
Council
>
2019
>
Agenda - Council - 05/14/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:29:15 PM
Creation date
6/17/2019 4:24:16 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/14/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOLTON <br />& MENK <br />Real People. Real Solutions. <br />April 16, 2019 <br />Bruce Westby, P.E. <br />City Engineer <br />7550 Sunwood Drive NW <br />Ramsey, MN 55303 <br />7533 Sunwood Drive NW <br />Suite 206 <br />Ramsey, MN 55303-5119 <br />RE: Proposal for Construction Staking Services <br />City of Ramsey Improvement Project #19-01, Ford Brook Estates Street Reconstructions <br />Dear Mr. Westby: <br />Ph: (763) 433-2851 <br />Fax: (763) 427-0833 <br />Bolton-Menk.com <br />We appreciate the opportunity to assist the City of Ramsey with the construction survey for the above <br />referenced project. We have reviewed the April 8, 2019 plans for the project and developed our scope <br />and fee based on those documents. <br />SCOPE OF WORK <br />Bolton & Menk will complete the following survey related tasks associated with the project: <br />• Establish Horizontal and Vertical Control, <br />• Create Stakeout Files, <br />• Storm Sewer Related, <br />• Culverts, <br />• Concrete Curb and Gutter (Both Sides Plus Cul-De-Sac), and <br />• Miscellaneous pavement, striping and restoration. <br />ASSUMPTIONS <br />We have made the following assumptions in preparing this proposal: <br />• We will be supplied with existing control that was used for the topographic survey, <br />• We will be supplied with AutoCAD files of the design, including alignments and profiles, and <br />• No allowances are included for as -built surveys, <br />PROPOSED FEES <br />Bolton & Menk will perform the work based on the hours and rates presented in the following table: <br />Personnel Hours Rate/Hr Total <br />Licensed Surveyor 2.0 $120.00 $ 240.00 <br />Survey Technician 6.0 $100.00 $ 600.00 <br />Survey Crew Chief 28.0 $115.00 $ 3,220.00 <br />Totals 36.0 $ 4,060.00 <br />C:AUsers\kevinki\DesktopA2019 Construction Staking Proposals\Ramsey - 2019 - 19-01ARamsey 2019 Construction Staking IP 19-01.docx <br />Bolton & Menk is an equal opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.