Laserfiche WebLink
g <br />z <br />- <br />, <br />- <br />, <br />° <br />,Q <br />. <br />:� <br />7 a <br />LOCATI O <br />SHEETS No. 5 - S <br />SHEETS No. 5 - S <br />SHEETS No. 16 <br />SHEETS No. 37 <br />QUANTIl <br />9,100 LF <br />23 EA. <br />.� <br />,x ~ <br />�2 /�\ <br />ow <br />^ <br />COR INFILTRATION BASIN IMPROVEMENTS <br />CITY PROJECT NO. 15-09 <br />CITY OF RAMSEY, MINNESOTA <br />\ \ <br />° <br />\ / <br />_ <br />`4 . <br />+ j <br />. <br />, <br />i . <br />` ` ; / <br />\ \e _ <br />, \ <br />�\ <br />\ <br />` <br />(((( \ } <br />k k D. <br />�.., <br />} \ <br />, . <br />_ . <br />. <br />,___ ) & <br />;!\; \\ { \g <br />\[; <br />IRE / P \) <br />— ,� <br />gement used if more than 1 a <br />nd <br />Management Not Required <br />UIREMENTS IN PROJECT PLAN <br />DESCRIPTION <br />ONTROL MEASURES <br />ON <br />CONTROL DETAILS <br />CONTROL QUANTITIES: <br />DESCRIPTION <br />IHOLE <br />UNIVERSITY OF M <br />Leonard Li <br />Design of Construction SWF <br />: \ f / <br />? <br />/,--: <br />_/\\\ <br />_ <br />))�2 \ <br />�-E ( <br />§) ! <br />\} _ <br />, ) <br />s ; <br />§ <br />\ \ <br />Type of storm water mana <br />a. Wet Sedimentation Po <br />b. Infiltration / Filtration <br />c. Regional Pond <br />d. Permanent Stormwate <br />TEMPORARY EROSION C <br />FINAL STABILIZATION <br />STORM SEWER TABULATI <br />EROSION AND SEDIMENT <br />EROSION AND SEDIMENT <br />SILT FENCE TYPE MS <br />INLET PROTECTION - MA <br />— <br />\ <br />: <br />, <br />I 1 <br />- <br />_ <br />I <br />\ <br />HEDULE AND PHASING: <br />rimeter sediment control and inlet protection. <br />bituminous street. <br />:uminous pavement. <br />Iporary BMP's as necessary during construction based on inspection reports. <br />ermination (NOT) to MPCA within 30 days of final stabilization. <br />t ensure final stabilization of the site. The permittee(s) must submit a NOT within 30 <br />zation is complete, or another owner/operator (permittee) has assumed control over <br />,ich have not undergone final stabilization. Final stabilization can be achieved in one of <br />activities at the site have been completed and all soils must be stabilized by a uniform <br />re cover with a density of 70 percent over the entire pervious surface area, or other <br />necessary to prevent soil failure under erosive conditions and; <br />s, constructed to drain water from the site after construction is complete, must be <br />de erosion; <br />hetic, and structural erosion prevention and sediment control BMP's (such as silt <br />removed as part of the site final stabilization; and <br />lust clean out all sediment from conveyances and from temporary sedimentation <br />s permanent water quality management basins. Sediment must be stabilized to <br />being washed back into the basin, conveyances or drainage ways discharging off -site <br />rters. The cleanout of permanent basins must be sufficient to return the basin to design <br />ver shall be in the Project Specifications. <br />struction only, final stabilization has been achieved when temporary erosion protection <br />: perimeter control for individual lots has been completed and the residence has been <br />homeowner. Additionally, the permittee must distribute the MPCA "Homeowner fact <br />!owner to inform the homeowner of the need for, and benefits of, final stabilization. <br />JTAL CONSIDERATIONS: <br />USEPA APPROVED <br />TMDL? <br />MISSISSIPPI RIVER RIVER YES YES YES <br />IMPAIRMENTS: NOT FOR AQUATIC CONSUMPTION OF AQUATIC RECREATION <br />\ <br />{ <br />. <br />} <br />FLOWS TO <br />IMPAIRED WATER <br />WITHIN 1 MILE? <br />CITY OF RAMSEY <br />City Of 7550 SUNWOOD DRIVE <br />"^N1`LY RAMSEY,FAX <br />(6303 <br />1�!]LVl J 1 (763) 427-1410 FAX (763) 433-9898 <br />0 \\ <br />\ <br />\ <br />\ <br />d in Part 15 of the permit for the design o1 <br />,en included in the preparation of this SWPP <br />unt, frequency, intensity and duration of pre <br />nwater runoff and run-on at the site. <br />Id stormwater volumes to minimize erosio <br />in. <br />article sizes expected to be present on the sr <br />uding surface water, wetlands, Public Wate <br />d map within 1 mile of the project bounda <br />are listed as follows. All specific BMP's rel. <br />impaired waters have been incorporatec <br />those BMP's listed for construction relat <br />r <br />TYPE (DITCH, POND, <br />WETLAND, LAKE, <br />ETC.) <br />= <br />NAME OF WATER <br />BODY <br />y <br />LiL <br />\=e <br />,«2_ : :: / .; <br />, <br />55 L, <br />\ <br />\ <br />\ <br />ude; Site Grading, Storm Sewer Construction, Temporary <br />tion, and Permanent Stabilization. <br />construction of 0.16 miles of existing bituminous streets <br />.treet to the existing width and grade, with the addition of <br />ig street flows to drainage swales to the northeast end of <br />the north. The construction will include the addition of drai <br />nor improvements will be made to the drainage ditches to <br />age to the out -fall location of the storm water runoff. <br />r must apply for coverage under the MPCA's General St <br />quired by the National Pollution Discharge Elimination Sy. <br />:he permit will begin automatically 7 calendar days after tf <br />rked date of a complete application. (Longer time fram, <br />arge within 1 mile of a special water). <br />} <br />(jj <br />\ \ <br />} <br />r. <br />Ei <br />tdividuals listed above, including the SWPPP prep. <br />nd amending the SWPPP, Individuals performing or <br />MP's must be trained. At least one individual preser <br />hall be trained in the applicable job duties. Docurr <br />uties and responsibilities is required to be included <br />opies of the SWPPP preparer information is includ <br />tformation for the individual(s) overseeing imple <br />epair of BMP's to be included in the Project Manual <br />kept up to date until the project NOT is filed. <br />iocumentation shall include: <br />. Names of trained personnel associated with this p <br />Dates of training, names of instructor(s) and entity <br />. Content of training course or workshop including.' <br />. As an alternative to a, b, and c listed above, <br />Management card issued by the University of I' <br />documentation of training. <br />IOCUMENTATION RETENTION: <br />'he following documentation will be retained for a pi <br />ff the NOT. <br />. The final SWPPP. <br />. Copies of all stormwater related permits required <br />. Records of all inspection and maintenance conduc <br />Copies of all permanent operation and maintenan <br />covenants and other binding requirements regard <br />All required calculations for design of temporary a <br />LJ <br />ES _ <br />` \ \ <br />SITE MANAGER: <br />PARTY RESPONSIBLE FOR <br />LONG TERM O&M: <br />j <br />| =w, _,a,.,,� „ ___ _._,_,_._ _._.= w,,.,:, �: <br />