My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/11/2019
Ramsey
>
Public
>
Agendas
>
Council
>
2019
>
Agenda - Council - 06/11/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:30:07 PM
Creation date
7/12/2019 11:31:41 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/11/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOLTON <br />& MENK <br />Real People. Real Solutions. <br />June 6, 2019 <br />Bruce Westby, P.E. <br />City Engineer <br />7550 Sunwood Drive NW <br />Ramsey, MN 55303 <br />7533 Sunwood Drive NW <br />Suite 206 <br />Ramsey, MN 55303-5119 <br />Ph: (763) 433-2851 <br />Fax: (763) 427-0833 <br />Bolton-Menk.com <br />RE: Proposal for Construction Staking Services <br />City of Ramsey Improvement Project #18-09, COR Infiltration Improvements <br />Dear Mr. Westby: <br />We appreciate the opportunity to assist the City of Ramsey with the construction survey for the above <br />referenced project. We have reviewed the May 23, 2019 plans for the project. <br />SCOPE OF WORK <br />Bolton & Menk will complete the following survey related tasks associated with the project: <br />• Establish Horizontal and Vertical Control, <br />• Create Stakeout Files, <br />• Storm Sewer — 300 ft, 3 structures, <br />• Pumping Station and Valve Vault, <br />• Access Road (800 ft — centerline), <br />• Ponds (1 contour around each pond), and <br />• As -built survey for the project when completed. <br />ASSUMPTIONS <br />We have made the following assumptions in preparing this proposal: <br />• We will be supplied with AutoCAD files of the design, including alignments and profiles of the <br />storm sewer, <br />• The As -Built Survey will consist of rim and invert elevations for the storm sewer, and contours <br />for the ponds. <br />• The As -Built information will be provided to the City in XYZ format. <br />PROPOSED FEES <br />Bolton & Menk proposes to perform the staking based on the hours and rates presented in the following <br />table: <br />Personnel Hours Rate/Hr Total <br />Survey Technician 6.0 $100.00 $ 600.00 <br />Survey Crew Chief 20.0 $115.00 $ 2,300.00 <br />Totals 26.0 $ 2,900.00 <br />C:AUsers\kevinki\DesktopA2019 Construction Staking Proposals\Ramsey - 2019 - 19-03\Ramsey 2019 COR Infiltration CP 18-09 Construction Staking.docx <br />Bolton & Menk is an equal opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.