Laserfiche WebLink
PAY ESTIMATE NO <br />BASE BID <br />ALTERNATIVE A <br />BASE BID PLUS ALTERNATIVES <br />BASE AREA <br />IP 19-01 Ford Brook Estates Street Reconstructions <br />Pay Estamite <br />1 <br />$ 249,901.55 <br />$ 12,601.70 <br />$ 262,503.25 <br />$ 134,223.20 <br />$ 6,415.20 <br />$ 140,638.40 <br />$ 134,223.20 <br />$ 6,415.20 <br />$ 140,638.40 <br />Item No. <br />MnDot <br />No <br />Item Description <br />Unit <br />CONTRACT AMOUNT <br />PAY THIS PERIOD <br />PAID TO DATE <br />Estimated <br />Quantity <br />Unit Price <br />Extension <br />Quantity <br />Extension <br />Quantity <br />Extension <br />1 <br />2021.501 <br />Mobilization <br />LS <br />1 <br />• $25,000.00 <br />$ 25,000.00 <br />0.5 <br />$ 12,500.00 <br />'0.5 <br />$ 12,500.00 <br />2 <br />2101.502 <br />Clearing Tree <br />TREE <br />4 <br />$ 450.00 <br />$ 1,800.00 <br />2 <br />$ 900.00 <br />2 <br />$ 900.00 <br />3 <br />2101.507 <br />Grubbing Tree <br />TREE <br />4 <br />$ 350.00 <br />$ 1,400.00 <br />2 <br />$ /00.00 <br />2 <br />$ 700.00 <br />4 <br />2104.501 <br />Remove Pipe Culverts <br />LF <br />142 <br />$ 15.00 <br />$ 2,130.00 <br />102 <br />$ 1,530.00 <br />102 <br />$ 1,530.00 <br />5 <br />2104.503 <br />Remove Concrete Pavement - Driveways <br />SF <br />1,370 <br />$ 1.15 <br />$ 1,575.50 <br />1,574 <br />$ 1,810.10 <br />1,574 <br />$ 1,810.10 <br />6 <br />2104.505 <br />Remove Bituminous Pavement - Driveways <br />SY <br />87 <br />$ 5.00 <br />$ 435.00 <br />88 <br />$ 440.00 <br />88 <br />$ 440.06 <br />7 <br />2104.505 <br />Remove Bituminous Pavement - Roadway <br />SY' <br />2,641 <br />$ 2.25 <br />$ 5,942.25 <br />2,641 <br />$ 5,942.25 <br />2,641 <br />$ 5,942.25 <br />8 <br />2104.505 <br />Remove Gravel Pavement - Driveways <br />'SY <br />117 <br />$ 4.50 <br />$ 526.50 <br />117 <br />$ 526.50 <br />117 <br />$ 526.50 <br />9 <br />2104.507 <br />Subgrade Excavation, Remove Unsuitable Material (EV) <br />CY <br />2,097 <br />$ 11.50 <br />$ 24,115.50 <br />2,220 <br />$ 25,530.00 <br />2,220 <br />$ 25,530.00 <br />10 <br />2104.511 <br />Sawing Concrete Pavement - Full Depth <br />LF <br />110 <br />$ 5.00 <br />$ 550.00 <br />112 <br />$ 560.00 <br />' 112 <br />$ 560.00 <br />11 <br />2104.513 <br />Sawing Bituminous Pavement - Full Depth <br />LF <br />113 <br />$ 3.00 <br />$ 339.00 <br />84 <br />$ 252.00 <br />84 <br />$ 252.00 <br />12 <br />2104.521 <br />Salvage and Install Retaining Wall <br />LF <br />52 <br />$ 100.00 <br />$ 5,200.00 <br />26 <br />$ 2,600.00 <br />26 <br />$ 2,600.00 <br />13 <br />2104.523 <br />Salvage and Install Mail Box Support <br />EA <br />8 <br />$ 125.00 <br />$ ' 1,000.00 <br />0 <br />$ - <br />0 <br />$ - <br />14 <br />2104.523 <br />Temporary Mail Box Cluster <br />EA <br />1 <br />$ 375.00 <br />$ 375.00 <br />1 <br />$ 375.00 <br />1 <br />$ 375.00 <br />15 <br />2105.501 <br />CommonExcavation(EV) <br />CY <br />175 <br />$ 20.00 <br />$ 3,500.00 <br />0 <br />$ - <br />0 <br />$ - <br />16 <br />2105.522 <br />Select Granular Borrow (CV) <br />CY <br />2,430 <br />$ 13.50 <br />$ 32,805.00 <br />2,324 <br />$ 31,374.00 <br />2,324 <br />$ 31,374.00 <br />17 <br />2105.604 <br />Geotextile Fabric Type V <br />SY <br />3,036 <br />$ 1.85 <br />$ 5,616.60 <br />3,036 <br />$ 5,616.60 <br />3,036 <br />$ 5,616.60 <br />18 <br />2112.501 <br />Subgrade Preparation <br />RDST <br />8 <br />$ 300.00 <br />$ 2,400.00 <br />8 <br />$ 2,400.00 <br />8 <br />$ • 2,400.00 <br />19 <br />2118.502 <br />Aggregate Surfacing, Class 5 Modified (LV) - Driveways <br />CY <br />16 <br />$ 65.00 <br />$ 1,040.00 <br />24 <br />$ 1,560.00 <br />24 <br />$ 1,560.00 <br />20 <br />2130.501 <br />Water <br />MGAL <br />16 <br />$ 45.00 <br />$ 720.00 <br />17.5 <br />$ 787.50 <br />17.5 <br />$ 787.50 <br />21 <br />2211.503 <br />Aggregate Base Class 5 Modified (CV) <br />CY <br />380 <br />$ 40.00 <br />$ 15,200.00 <br />372 <br />$ 14,880.00 <br />372 <br />$ 14,880.00 <br />22 <br />2232.501 <br />Mill Bituminous Pavement (1.5") <br />SY <br />126 <br />$ 10.00 <br />$ 1,260.00 <br />126 <br />$ 1,260.00 <br />126 <br />$ 1,260.00 <br />23 <br />2357.502 <br />Bituminous Material for Tack Coat <br />GAL <br />200 <br />$ 3.00 <br />$ 600.00 <br />0 <br />$ - <br />0 <br />$ - <br />24 <br />2360.501 <br />Type SP 9.5 Wearing Course Mixture (SPWEA34OC) (1.5") <br />TON <br />230 <br />$ 95.50 <br />$ 21,965.00 <br />0 <br />$ - <br />0 <br />$ - <br />25 <br />2360.501 <br />Type <br />2 p jSP 9.5 Wearing Course Mixture (SPWEA34C) Driveways <br />TON <br />10 <br />$ 150.00 <br />$ 1,500.00 <br />0 <br />$ - <br />0 <br />$ - <br />26 <br />2360.502 <br />Type SP 12.5 Non Wearing Course Mixture (SPNWB33OC) <br />(2 0„) <br />TON <br />302 <br />$ 81.75 <br />$ 24,688.50 <br />0 <br />$ - <br />0 <br />$ - <br />27 <br />2501.511 <br />15" CS Pipe Culvert <br />LF <br />127 <br />$ 56.00 <br />$ 7,112.00 <br />108 <br />$ 6,048.00 <br />108 <br />$ 6,048.00 <br />28 <br />2501.515 <br />15" CS Pipe Apron <br />EA <br />8 <br />$ 630.00 <br />$ 5,040.00 <br />6 <br />$ 3,780.00 <br />6 <br />$ 3,780.00 <br />29 <br />2501.602 <br />Clean Pipe Culvert <br />EA <br />5 <br />$ 400.00 <br />$ 2,000.00 <br />0 <br />$ - <br />.0 <br />$ - <br />30 <br />2502.541 <br />4" Peril Pipe Drain <br />LF <br />721 <br />$ 15.00 <br />$ 10,815.00 <br />721 <br />$ 10,815.00 <br />721 <br />$ 10,815.00 <br />. 31 <br />2506.501 <br />Construct Drainage Structure Design 48-4020 <br />LF <br />5.3 <br />$ 455.00 <br />$ 2,411.50 <br />0.0 <br />$ - <br />0 <br />$ - <br />32 <br />2506.516 <br />Furnish & Install Casting Assembly - Storm <br />EA <br />1 <br />$ 850.00 <br />$ 850.00 <br />0 <br />$ - <br />0 <br />$ - <br />33 <br />2506.522 <br />Adjust Frame & Ring Casting <br />EA <br />1 <br />$ 650.00 <br />$ 650.00 <br />0 <br />$ - <br />0 <br />$ - <br />34 <br />2531.507 <br />6" Concrete Driveway Pavement <br />• SF <br />1,377 <br />$ 13.25 <br />$ 18,245.25 <br />0 <br />$ - <br />0 <br />$ - <br />35 <br />2540.601 <br />Landscape Restoration <br />LS <br />1 <br />$ 4,500.00 <br />$ 4,500.00 <br />0 <br />$ - <br />0 <br />$ - <br />36 <br />2563.601 <br />Traffic Control <br />LS <br />1 <br />$ 1,500.00 <br />$ 1,500.00 <br />1 <br />$ 1,500.00 <br />1 <br />$ 1,500.00 <br />37 <br />2572.501 <br />Tree Protection Fence <br />LF <br />155 <br />$ 2.75 <br />$ 426.25 <br />85 <br />$ 233.75 <br />85 <br />$ 233.75 <br />38 <br />2573.502 <br />Silt Fence, Type MS <br />LF <br />220 <br />$ 2.75 <br />$ 605.00 <br />110 <br />$ 302.50 <br />110 <br />$ 302.50. <br />39 <br />2573.530 <br />Storm Drain Inlet Protection - Manhole <br />EA <br />1 <br />$ 225.00 <br />$ 225.00 <br />0 <br />$ - <br />0 <br />$ - <br />40 <br />2573.530 <br />Storm Drain Inlet Protection - Culvert <br />EA <br />20 <br />$ 120.00 <br />$ 2,400.00 <br />0 <br />$ - <br />0 <br />$ - <br />41 <br />2574.508 <br />FertilizerType3 <br />LBS <br />52 <br />$ 1.10 <br />$ 57.20 <br />0 <br />$ - <br />0 <br />$ - <br />42 <br />2574.525 <br />Topsoil (LV) <br />CY <br />173 <br />$ 40.00 <br />$ 6,920.00 <br />0 <br />$ - <br />0 <br />$ - <br />43 <br />2575.501 <br />Hydroseeding <br />ACRE <br />1 <br />$ 4,500.00 <br />$ 2,340.00 <br />0 <br />$ - <br />0 <br />$ - <br />44 <br />2575.502 <br />Seed Mixture 25-151 <br />LBS <br />63 <br />$ 3.50 <br />$ 220.50 <br />0 <br />$ - <br />0 <br />$ - <br />45 <br />2575.505 <br />Sodding Type Lawn <br />SY <br />83 <br />$ 16.00 <br />$ 1,328.00 <br />0 <br />$ - <br />0 <br />$ - <br />46 <br />2575.562 <br />Hydraulic Matrix Type Mulch <br />LBS <br />1,040 <br />$ 0.55 <br />$ 572.00 <br />0 <br />$ - <br />0 <br />$ - <br />TOTAL BID <br />$ 249,901.55 <br />$ 134,223.20 <br />$ 134,223.20 <br />ALTERNATE A <br />Item No. <br />MnDot <br />No.Item <br />Description <br />Unit <br />CONTRACT AMOUNT <br />PAY THIS PERIOD <br />PAID TO DATE <br />Estimated <br />Quantity <br />Unit Price <br />Extension <br />Quantity <br />Extension <br />- Quantity <br />Extension <br />1 <br />2101.502 'Clearing <br />Tree <br />TREE <br />1 <br />$ 450.00 <br />$ 450.00 <br />0 <br />$ . - <br />0 <br />$ - <br />2 <br />2101.507 <br />Grubbing Tree <br />TREE <br />1 <br />$ 350.00 <br />$ 350.00 <br />0 <br />$ - <br />0 <br />$ - <br />3 <br />2104.503 <br />Remove Concrete Pavement - Driveways <br />SF <br />208 <br />$ 1.15 <br />$ 239.20 <br />208 <br />$ 239.20 <br />208 <br />$ 239.20 <br />4 <br />2104.507. <br />Subgrade Excavation, Remove Unsuitable Material (EV) <br />CY <br />. 160 <br />$ 11.50 <br />$ 1,840.00 <br />160 <br />$ 1,840.00 <br />160 <br />$ 1,840.00 <br />5 <br />2105.501 <br />Common Excavation (EV) <br />CY <br />10 <br />$ 25.00 <br />$ 250.00 <br />0 <br />$ - <br />0 <br />$ - <br />6 <br />2105.522 <br />Select Granular Borrow (CV) <br />CY <br />192 <br />$ 13.50 <br />$ 2,592.00 <br />192 <br />$ 2,592.00 <br />192 <br />$ 2,592.00 <br />7 <br />2105.604 <br />Geotextile Fabric Type V <br />SY <br />240 , <br />$ 2.00 <br />$ 480.00 <br />240 <br />$ 480.00 <br />240 <br />$ 480.00 <br />8 <br />2211.503 <br />Aggregate Base Class 5 Modified (CV) <br />CY <br />32 <br />$ 39.50 <br />$ 1,264.00 <br />32 <br />$ 1,264.00 <br />32 <br />$ 1,264.00 <br />9 <br />2357.502 <br />Bituminous Material for Tack Coat <br />GAL <br />17 <br />$ 3.00 <br />$ 51.00 <br />0 <br />$ - <br />0 <br />$ - <br />10 <br />2360.501 <br />TypeSP 9.5 Wearing Course Mixture (SPWEA34OC) (1.5") <br />TON <br />20 <br />$ 95.50 <br />$ 1,910.00 <br />0 <br />$ - <br />0 <br />$ - <br />11 <br />2360.502 <br />Type SP 12.5 Non Wearing Course Mixture (SPNWB330C) <br />(2.0") <br />TON <br />26 <br />$ 81.75 <br />$ 2,125.50 <br />0 <br />$ - <br />0 <br />$ - <br />12 <br />2571.502 <br />Decidious Tree 2.5" Cal. BR <br />EA <br />1 <br />$ 1,050.00 <br />$ 1,050.00 <br />0 <br />$ - <br />0 <br />$ - <br />TOTAL BID <br />$ 12,601.70 <br />$ 6,415.20 <br />$ 6,415.20 <br />