My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Council Work Session - 07/16/2019 - Special
Ramsey
>
Public
>
Minutes
>
Council Work Session
>
2019
>
Minutes - Council Work Session - 07/16/2019 - Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 12:29:34 PM
Creation date
7/30/2019 8:38:08 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Council Work Session
Document Title
Special
Document Date
07/16/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
other options are different, they may be considered more traditional interchange options, but also <br /> have additional cost. <br /> Community Development Director Gladhill confirmed that there is strong support for the grade <br /> separation for the rail crossing and highway, with some concern with the right-in/right-out <br /> option. He stated that there has been a request from Lano to bring the right-in/right-out closer to <br /> their business. <br /> Ms. Bersaw stated that they are still planning for the frontage road between Ramsey Boulevard <br /> and Sunfish. She noted that there is a high cost estimated at this time, but that cost could be <br /> reduced as time moves forward as that estimate also includes RALF costs. She highlighted <br /> another frontage road option along the Tungsten district, which was carried forward from the <br /> 2014 study. She stated that there have been discussions with the businesses in those locations on <br /> the functionality of that frontage road and the heavy equipment that would be moving on the <br /> road. She explained that the cost estimates included for all options are in 2025 numbers because <br /> that is when Anoka would be completed and is a more accurate estimate of when work could <br /> possibly begin. She referenced the west end plans, which have been on hold until there is further <br /> input from Elk River and MnDOT on the future plans for that corridor. She noted that the plan <br /> thus far includes an interim safety improvement for a minimal cost that would simply formalize <br /> the movements that most people are already making in that area. She stated that she will be <br /> providing a similar update to the County Board tomorrow and then there is another TAC meeting <br /> later this week. She stated that they are nearing the end of the phase one planning and the next <br /> step would be to continue on to phase two, which includes funding strategies. <br /> Acting Mayor Riley stated that this Ramsey portion of Highway 10 is the third piece of three and <br /> would complete this section of the highway. <br /> Councilmember Musgrove asked if there is room for expansion of Highway 10 lanes, should a <br /> third lane continue. <br /> Ms. Bersaw stated that the Anoka project has squeezed enough room where a third lane could be <br /> added under the interchanges in the future. She stated that perhaps Ramsey would plan for a <br /> similar thing so that option is not precluded in the future. <br /> Community Development Director Gladhill noted that the Council consensus will be conveyed <br /> to the County Board and TAC this week. <br /> 2.02: Staff Update on Water Supply System Request for Proposals <br /> City Engineer Westby reviewed the staff report. <br /> Acting Mayor Riley asked how the system would be modeled if there has not been a water <br /> supply system before. <br /> City Engineer Westby provided additional details on water infrastructure. He confirmed that it <br /> has not been done on a system wide basis before. <br /> City Council Work Session/July 16,2019 <br /> Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.