My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 03/15/2005
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2005
>
Agenda - Public Works Committee - 03/15/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 2:25:56 PM
Creation date
3/11/2005 3:17:52 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
03/15/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVE FEASIBILITY STUDY FOR ST FRANCIS BLVD <br />FRONTAGE ROAD IMPROVEMENT PROJECT 05-24 <br /> By: Steven J JankOWski, City Engineer <br /> <br />CASE # <br /> <br />Background: <br /> <br />During the summer of 2004 the City received a petition signed by all three residents <br />fronting on the frontage road along TH 47 requesting the paving of the frontage road <br />along TH 47 south of 160t~ Lanel The City Council directed that a feasibility study be <br />prepared on August 10, 2004. Attached to this case is a copy of the feasibility study <br />which has been prepared in accordance with the Council's directives. <br /> <br />The feasibility study proposes improvements that includes grading and paving the <br />roadway to a width of 32 with the easternmost eight feet of this section being striped for <br />use as a trail for pedestrian and nOn mOtoriZed traffic. In order to confine the widened <br />roadway to the 45 foot right of way reserved for the City, it will be necessary to install a <br />bituminous berm curb along the westemedge of the pavement. This will also preserve <br />the landscaped hedgerows of trees and shrubs, which would otherwise need to be <br />removed to accommodate a ditch section. The southern terminus of the roadway shall be <br />provided with a 70 foot diameter cul-de-sac which is approXimately 10 feet wider than <br />the existing dirt cul-de-sac. <br /> <br />The total cost of the work is estimated to be $46,011. The estimated cost of the trail is <br />$7,863 which is to be financed through the City's trail fund.. The remaining costs are <br />proposed to be financed in the amount of $19,075 from the City's general fund and a <br />similar amount to be financed through Special assessments to the benefited property <br />owners. An estimated assessment of $6,358 would be incurred by each of the three <br />property owners. <br /> <br />Staff anticipates that a development prOposing the extension of sewer and water services <br />to property on the east side of TH 47 may cause construction impacts to this project area. <br />[n the event such a project materializes ~the improvements described ih this feasibility <br />study may be altered to include sanitary seWer, watermain storm sewer and concrete curb <br />and gutter. In the event this happens the project costs will need to be appropriately <br />modified, however, it is proposed thai the Cost to the benefited properties shall be held to <br />those outlined in this report and the additional costs be financed through other sources. <br /> <br />The schedule proposed in the feasibility: study anticipates the project being ordered on <br />July 12, 2005. In the event the sewer and Water impacts have not been resolved by this. <br />date, the Council would need to decide Whether to order the project as outlined in the <br />feasibility study or modify the project SChedUle such that construction is initiated in May <br />of 2006. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.