My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/22/2005
Ramsey
>
Public
>
Agendas
>
Council
>
2005
>
Agenda - Council - 03/22/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:46:16 PM
Creation date
3/18/2005 11:51:10 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/22/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Upon written demand by theiCounty,'the CitY Shall pay to the CountY the appraised value portion <br />of the Land Acquisition CoSts. Up°n final cOmpletion of the each parcel acquisition, the City <br />shall pay for all remaining Land Acquisition Costs within 30 days after receipt of an invoice from <br />the County documenting the :expenses incUrred. <br /> <br />16. <br /> <br />After construction has been Completed, ithe city shall convey the property it acquired to <br />widen/improve the countY highwaYs by.' warranty deed to the CountY. <br /> <br />SIGNALIZATION POWER : <br /> <br />The City shall at their sole expense, install or cause the installation of an adequate electrical <br />power source to the service Cabinet for all signalized intersections including any necessary <br />extension of power lines. The CitY shall be the lead agency in this matter. Upon completion of <br />said traffic control signal installations, the ongOing cost of the electrical power to the signal shall <br />be the sole cost and expense of the <br /> <br />City. <br /> <br />17. <br /> <br />MAINTENANCE <br /> <br />Maintenance of the completed water main, sanitary sewer, storm sewer (except catch basins and <br />catch basin leads on county highwaYs), idetention basins (including ponds and their outlet <br />structures and any grit chambers/collectors including the "Vetch Stormwater Treatment System") <br />shall be the sole obligation ofthe City2 <br /> <br />The County will maintain the CountY State Aid Highways and County Roads following <br />completion of the construction and during winter suspension of work so long as the road surface <br />is bituminous. If for any reason the road surface is not hard surfaced by winter suspension of <br />work the City shall maintain the road surface ~ontinuously until work resumes. <br /> <br />Maintenance of all trails and: Sidewalksi including snow plowing, shall be the sole responsibility <br />of the City. <br /> <br />Maintenance of streetlights and cost of electrical power to the streetlights shall be the sole <br />obligation of the City. <br /> <br />Maintenance of all city streets shall be the so!id obligation of the City. <br /> 13 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.