My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/22/2005
Ramsey
>
Public
>
Agendas
>
Council
>
2005
>
Agenda - Council - 03/22/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:46:16 PM
Creation date
3/18/2005 11:51:10 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/22/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sanitary Sewer <br />Item <br />Connect to existing sewer <br />8" PVC san sewer <br />48" manhole <br />8" X 4" wye <br />8" X 6" wye <br />4" service lateral <br />6" service lateral <br />Bituminous ~emoval <br />Class 5 restoration <br />Bituminous base restoration' <br />Subtotal <br />Total wi 25% contingencies <br /> <br />Watermain - Service Extension <br />Item <br />Connect to existing watermain <br />8" DIP watermain <br />Hydrant w/valve <br />8' valve <br />1' curb stop and box = <br />1" corporation stop <br />1" type K copper <br />4" valve w/box <br />4" DiP service lateral <br />Subtotal <br />Total wi 25% contingencies <br /> <br />Watermain - Looping <br />Item <br />Connect to existing watermain <br />8' DIP watermain <br />Hydrant w/valve <br />Bituminous removal <br />Class 5 restoration <br />Bituminous base restoration <br />Subtotal <br />Total wi 25% contingencies <br /> <br />Street Improvements <br />Item. <br />Bituminous removal <br />Bituminous wear <br />Sod <br />Topsoil borrow <br />Driveway restoration <br />Subtotal <br />Total wi 25% contingencies <br /> <br />Concrete curb and gutter <br />Concrete curb and gutter <br />Total wi 25% contingencies <br /> <br />APPENDIX C <br /> <br />EBONY STREET PROJECT COSTS <br /> <br />Qn'.ty Unit <br />11 each <br />400 feet <br />1 each <br />4 each <br />2 each <br />- 134 feet <br />68 feet <br />160Q sq yds <br />336 ton <br /> 192. ton <br /> <br />Qnty <br /> t <br /> 4513 <br /> 1 <br /> 1 <br /> 4 <br /> 4 <br /> 134 <br /> <br /> 66 <br /> <br />Unit <br />each <br />feet <br />each <br />each <br />each <br />each <br />feet <br />each <br />~et <br /> <br />Unit Cost <br />$ 500.00 <br />$ 16.00 <br />$ 1,600.00 <br />$ 135.00 <br />$ 125.00 <br />$ 8.00 <br />$ ' 15.00 <br />$ 1.50 <br />$ 10.00 <br />$ 35.00 <br /> <br /> Extension <br />$ 500 <br />$ 6,400.00 <br />$ 1,600 <br />$ 540 <br />$ 250 <br />$ 1,072 <br />$ 99O <br />$ 2,400 <br />$ - 3,36O <br />$ 6,720 <br />$ 23,832 <br />$ 29,790 <br /> <br />Unit Cost Extension.. <br />$ 500.00 $ 500 <br />$ 18.00 $ 8,100 <br />$ 2,000.00 $ 2,000 <br />$ 900.00 $ 900 <br />$ 110.00 $ 440 <br />$ 50.00 $ 200 <br />$ 9.00 $ 1,206 <br />$ 500.00 $ 1,000 <br />$ 15.005 990 $ 15,336 <br /> $ 19,170 <br /> <br />Qnty <br /> 1 <br /> 650 <br /> 1 <br />1560 <br /> 33o <br /> 19o <br /> <br />Unit Unit Cost Extension <br />each $ 500.00 $ 500 <br />~et $ 18.00 $ 11,700 <br />each $ 2,000.00 $ 2,000 <br />sq yds $ 1.50 $ 2,340 <br />~n $ 1~00 $ 3,300 <br />~n $ 35.00 $ 6,650 <br /> $ 26,490 <br /> $ 33,113 <br /> <br />Qnty <br /> 735 <br /> 355 <br />i470 <br /> 165 <br /> 60 <br /> <br />2 oO <br /> <br /> Unit <br />sqyds <br /> ton <br />sq yds <br />cu yds <br />sq yds <br /> <br />feet <br /> <br />Unit Cost <br />$ 1.50 <br />$ 38.00 <br />$ 2.50 <br />$ 10.00 <br />$ 20.00 <br /> <br />Extension. <br />1,103 <br />13,490 <br />3,675 <br />1,650 <br />1,200 <br />21,118 <br />26,397 <br /> <br />$ 8;00 $ 17,600 <br /> $ 22,000 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.