Laserfiche WebLink
Joe Feriancek <br />Len LintonLen LintonLen LintonLen LintonLen Linton <br />05/28/2019 4:32 PM05/28/2019 4:28 PM05/28/2019 4:25 PM05/28/2019 4:25 PM05/29/2019 9:05 AM05/16/2019 10:21 AM <br />Markup Date <br />approved by the City before it is submitted to the MPCA.Install secondary silt fence constructed. Remove only overland flow from new pond Plans must be submitted to Area draining to <br /> basins must Talk about infiltration results The boundary didn't show up <br />MNDOT for access review. <br />The Notice of Termination <br />results summary in report. <br />submitted to MNDOT for <br />Include MIDS Calculator <br />Changemark Details <br />Drainage plans must be <br />after infiltration basin is <br />BMP detail sheets and <br />for the Permit must be <br />Show general route of <br />not exceed infilration <br />capacity of the basin. <br />established in basin. <br />to existing drainage <br />in report summary. <br />after vegetation is <br />Hydrology review. <br />on the map. <br />structures. <br />MNDOT submittal required <br />Changemark Subject <br />Infiltration Calculations <br />Notice of Termination <br />Secondary Silt Fence <br />1-Mile Boundary <br />Overland Flow <br />Markup Name <br />JJF <br />LLLLLLLLLL <br />CIVIL GRADING PLAN.pdfCIVIL GRADING PLAN.pdf <br />CIVIL SWPPP PLAN.pdfCIVIL SWPPP PLAN.pdf <br />Stormwater Report.pdf <br />File <br />CIVIL ESC PLAN.pdf <br />Snapshot <br />Engineering Tech - <br />Department <br /> <br />