Laserfiche WebLink
Eric Maass <br />Len LintonLen LintonLen LintonLen Linton <br />03/28/2019 3:00 PM03/22/2019 4:13 PM03/22/2019 3:27 PM03/22/2019 3:27 PM03/22/2019 3:12 PM <br />the proposed parking is over cost of grading a basin sized to hold the volume of 0.293 drawdown rate of 0.8 inches/ recommend changes to the Cleanout riser pipe shall be Connection to <br /> sewer shall be long radius bend to allow This SWPPP must address Permit. It appears content <br />acre-feet with a drawdown <br />control credits is based on Provide an estimate of the <br />spaces since as proposed The pricing for the volume <br />the minimum by 9 spaces. <br />estimate and approve the <br />hour (common rate in the <br />may need to be added to <br />Consider expanding Dog Construction Stormwater <br />Park to utilize the space <br />construct and infiltration Detail numbers must be Check spelling on detail <br />shown as the 9 parking <br />The City will review the <br />time of 48i hours and a <br />passage of jetter hose. <br />purchasing credits or <br />the estimated cost to <br />all items listed in the <br />estimate for use in <br />this sheet. <br />estimate. <br />updated. <br />8" PVC. <br />names. <br />COR). <br />basin. <br />Infiltration Credit Calculation <br />Cleanout Riser Pipe <br />Changemark #01SWPPP Content <br />Detail numbers <br />Planning 3.28.19 <br />LLLLLLLL <br />2325.07 SWMP 3-6-19.pdf <br />Arch Site Plan.pdf <br />C4.pdfC4.pdfC9.pdf <br /> <br />