Laserfiche WebLink
Len LintonLen LintonLen LintonLen LintonLen Linton <br />06/26/2019 10:01 AM06/26/2019 10:01 AM06/26/2019 8:34 AM06/26/2019 8:34 AM06/26/2019 8:34 AM <br />must be revised. The water where the pipes enter must assumed soil types is 1.5 ft.The normal water level of a unlikely that a normal water direct water to the infiltratio determint <br /> the soil type and depth to groundwater before the design can be approved.Align Driveway with Jaspar <br />get to 5 feet deep before it Sidewalk in public Right of <br />debris before discharge to <br />Layout of infiltration basin <br />performed in this basin to manhole to catch grit and <br />maintained on this site to <br />level in the south portion <br />maximum depth with the Add City Detail for street <br />pond to the southeast is <br />approximately 850. It is <br />This should be a sump <br />infilrtation basin. The <br />starts flowing into the <br />A soil boring must be <br />Way shall be 6" thick. <br />level of 855 could be <br />the infiltration basin. <br />patching to set. <br />Street. <br />basin. <br />Infiltration Basin Design <br />Sump manhole <br />Align Driveway <br />City Detail <br />Sidewalk <br />LLLLLLLLLL <br />C5.pdfC5.pdfC3.pdfC3.pdfC3.pdf <br /> <br />