My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 07/10/2019
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2019
>
Agenda - Planning Commission - 07/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:34:17 AM
Creation date
8/26/2019 3:16:14 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
07/10/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Joe FeriancekJoe FeriancekJoe FeriancekJoe FeriancekJoe FeriancekJoe Feriancek <br />06/20/2019 10:00 AM06/20/2019 9:56 AM06/20/2019 9:58 AM06/20/2019 9:58 AM06/20/2019 8:57 AM06/20/2019 8:57 AM <br />Markup Date <br />City Details can be found on STO-1 Catch Basin; STO-8 Trash Guard; STR-2 Cross and Gutter Detail Required.Silt Fence needs to continue silt fence to NE Lot Line. No Slopes are scaling <br /> at 4.6% <br />Proposed work is a higher elevation than the existing <br />Patching Standards; Curb valley gutters to the storm <br />ERO-1 Silt Fence; ERO-3 than grading, need to add <br />If existing ground is lower <br />City Engineering Website.Rip Rap; ERO-4 Bio Roll; <br />sediment allowed off-site. <br />Recommend connecting <br />Changemark Details <br />Looks like we're holding <br />water north of the Curb. <br />Gutter; STR-25 Street <br />sewer inlets to assure <br />ground to the west. <br />rather than 2.0%. <br />further north. <br />0.57' / 12.5' <br />drainage. <br />Additional Details Required <br />East Lot Sediment Control <br />Changemark Subject <br />Mid Building 2.0% Slope <br />North 887 Contour <br />Valley Gutter <br />Silt Fence <br />Markup Name <br />JJF2 <br />JJFJJFJJFJJFJJF <br />SEDIMENTATION CONTROL PLAN.pdfSEDIMENTATION CONTROL PLAN.pdf <br />C7-EROSION CONTROL & C7-EROSION CONTROL & <br />C6-GRADING PLAN.pdfC6-GRADING PLAN.pdfC6-GRADING PLAN.pdf <br />File <br />C8-DETAILS.pdf <br />Snapshot <br />Engineering Tech - Engineering Tech - Engineering Tech - Engineering Tech - Engineering Tech - Engineering Tech - <br />Department <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.