Laserfiche WebLink
Commissioner Johnson stated that if the land is donated for a park, people would most likely not <br />want a park on contaminated soils. <br /> <br />Community Development Director Gladhill noted that development of a park would still trigger <br />the need to clean-up the site. <br /> <br />Commissioner VanScoy asked for details on the nature of the contamination and the reason it is <br />important to remove the material. <br /> <br />Jim Crowl stated that they have learned that there was uncontrolled dumping on the site between <br />1953 to 1970. He stated that there is about 32,000 cubic yards of material and about 16,000 <br />cubic yards of that material is debris. He noted that because of the nature of the dump materials <br />there is additional soil that would need to be removed because of the leaching that occurs over <br />time. He stated that there are impacts to groundwater that can occur and in some test pits on the <br />site the waste material is in contact with the water table. <br /> <br />Commissioner VanScoy stated that there have been comments from residents stating that this is <br />not an issue for them because they cannot see visual impacts. He noted that he is very concerned <br />with the contamination. <br /> <br />Jim Crowl stated that they will also look at soil vapor during this process to determine if there are <br />potential vapors being generated. He stated that this is not just the consultant/engineer working <br />with the bank and City. He explained that all the clean-up activities are being completed in <br />conjunction with the Minnesota Pollution Control Agency (MPCA). He noted that a Response <br />Action Plan has been developed and approved by the State of Minnesota. <br /> <br />Commissioner VanScoy referenced a comment that was made relating to the Mississippi Trail <br />and the segment that goes down this street. He asked if there is any consideration to installing a <br />bike trail or adding a sidewalk to the existing neighborhood. <br /> <br />City Planner McGuire Brigl stated that the City will require a sidewalk on one side of the <br />development, noting that staff recommends that it be added to the southside of the development. <br />She noted that a bike trail has not yet been discussed. <br /> <br />Commissioner VanScoy stated that when the trail exits the new neighborhood it would still <br />empty onto the existing street. He asked what could be done to resolve that issue for the existing <br />neighborhood. <br /> <br />Community Development Director Gladhill noted that the Public Works Committee could <br />review that element. He explained that the Mississippi River Trail is a combination of off-road <br />trail and on-road trail. He stated that staff can solve and make requirements for the proposed <br />development and speak with public works for the segment through the existing neighborhood. <br /> <br />Commissioner VanScoy stated that the prior recommendation from the Commission was 12 lots, <br />while the City Council supported 14. He asked for input on that decision. <br /> <br />Planning Commission/ June 6, 2019 <br />Page 10 of 21 <br /> <br />