Laserfiche WebLink
COMMUNICATION SOFTWARE <br />Bradbury Stamm focuses on effective communication management throughout the project. The basis of our philosophy <br />for effective communication is establishing clear and concise lines for information exchange between the project team. <br />The Bradbury Stamm project team generates or oversees all project specific information including: preconstruction, <br />scheduling, correspondence, clarifications, cost control issues, procurement, management of subcontractor issues, <br />submittals, deliveries, payment applications, monthly reports, project close-out and turnover. The tool utilized to allow <br />the Project Team to manage these functions efficiently is Procore. Procore is an easy to use, cloud -based, construction <br />management tool that is accessible by every member of the project team on their computer, tablet or smart phone. <br />Each of our superintendents carries a portable tablet while on the <br />site and uploads daily logs, construction photos, RFIs and daily <br />correspondence in real time. This allows the management team, design <br />professionals and the City of Ramsey to log into the project portal <br />and see the daily progress from any location. In the same manner <br />information can be disseminated to the project sites via Procore or <br />regular email directly to the superintendent. This eliminates delays <br />in communication and ensures the project team is communicating <br />effectively. <br />BUILDING INFORMATION MODELING (BIM) <br />The Bradbury Stamm BIM Coordination process results in <br />highly coordinated building systems which support increased <br />productivity/quality during construction and ease of <br />maintenance during the life of the facility. Bradbury Stamm <br />has complete BIM capabilities, including modeling all aspects <br />of the project from early design concepts through project <br />completion. <br />Key Elements of the BIM Execution Plan for the Ramsey <br />Public Works and Fleet Maintenance Facility project include: <br />• Ensuring a cohesive BIM Execution Plan across all team <br />disciplines, including designers, contractors and end users <br />so that information being created in the model efficient <br />and usable by all team members. <br />• Develop and Turnover 3D BIM As Builts at the end of <br />the project so that end users and building maintenance <br />staff can easily find and service the new equipment. <br />There are many emerging technologies that can be <br />utilized in conjunction with the 3D BIM As Builts and we <br />look forward to meeting with you and your facilities and <br />maintenance staff to find the one that works best for them. <br />Bradbury Stamm <br />"We went through a rigorous BIM Coordination process and <br />all RFI and Shop Drawing review and information was posted <br />on the E-Builder site. Coordination and interaction between <br />the Contractor, the Architect and Engineers and the Owner <br />is critical on a project of this scale and complexity. THE <br />BRADBURYSTAMM STAFF WAS ON TOP OF THE ISSUES <br />AND THINGS ALWAYS GOT RESOLVED IN A SCHEDULE <br />SENSITIVE AND COST EFFECTIVE MANNER." <br />Jon Anderson, FAIA, Jon Anderson Architecture <br />George I. Sanchez Collaborative Community School <br />Ramsey Public Works and Fleet Maintenance Facility <br />Proposal for Construction Manager as Construction Services <br />August 9, 2019 <br />20 <br />Construction <br />