Laserfiche WebLink
2. FEES <br />-Mei <br />Stamm <br />;,ruction5 <br />Bradbury Stamm Planning Session with <br />Project Manager Chris Koepp <br />A. Please propose your construction management fee, a proposed general conditions amount by <br />preconstruction service and potential construction services breakdown (with phase I -construction <br />services being potential items like site work) and phase II construction services being the building (which <br />the timing is pending). <br />Please refer to the following pages. <br />B. Please list items that are provided as part of general conditions and not included in the proposed <br />construction management fee. <br />Please refer to the following pages. <br />C. Provide a separate fee, if any, for pre -construction services, which will include attending weekly design <br />review meetings, providing a schematic design(SD) cost estimate, ongoing value analysis and overseeing <br />preparation of bid documents and assisting with bidding and review of contractors. <br />Please refer to the following pages. <br />Bradbury Stamm <br />Ramsey Public Works and Fleet Maintenance Facility <br />Proposal for Construction Manager as Construction Services <br />August 9, 2019 <br />29 <br />Construction = <br />