My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 08/27/2019
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2019
>
Agenda - Council Work Session - 08/27/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:33:00 PM
Creation date
8/29/2019 2:13:59 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
08/27/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Additional Information <br />BUILD <br />RELATIONSHIPS <br />"Builders first." At RJM, we are more than just a "paper pushing" consultant, we <br />are builders. The public works expansion may present challenges in both design and <br />construction and if executed properly, will require a builder's input. RJM has worked <br />in numerous complex structures over the years with a hands-on approach. Time and <br />time again, we have seen that our creative solutions result in significant cost savings. <br />Our team of full-time experts will be dedicated to your project <br />providing the necessary supervision for success from start to finish. <br />As a general contractor and construction manager integrated with the <br />subcontracting community, we draw only from a base of qualified subcontractors, <br />resulting in a greater quantity of bids received at an economical price. <br />Design and budget control: From our experience, we have seen that go% of all cost <br />savings are realized during preconstruction. As construction manager, RJM leads <br />the preconstruction process, and we ensure that the design always aligns with the <br />budget. Our early involvement also allows the opportunity to provide a design -assist <br />approach for critical systems such as HVAC, plumbing, electrical, and structural. This <br />proven approach challenges teams to think outside of the box, creating more cost- <br />effective and efficient designs. <br />Timing: We strategically design bid packages creating an overlap in construction <br />activities and design, resulting in faster schedules and reduced general conditions <br />costs. Early involvement prevents unnecessary delays due to redesign because of a <br />project that exceeds the budget on bid day. <br />Design Team Selection: RJM has worked with all of the major design firms in the <br />public service market, including 292 Design, BKV, HCM, Kodet, Oertel, and many <br />others. We are happy to assist the City of Ramsey in the design RFP process and have <br />done so with many of our other municipal partners. We have RFP templates and will <br />work with city staff to ensure a level playing field throughout that process. <br />Creative Solutions for the City of Ramsey <br />We have already started working on your project and discussing potential ideas with <br />design firms. We understand that the city has exhausted all available space, and <br />therefore, our priority will be to expedite the process strategically so that we address <br />all details and that everyone has a voice. <br />Although the proposal suggests design and pre -construction through the end of <br />2o2i, depending on funding and approval from the city, the project could start in <br />2020. <br />Through preliminary discussions, we plan to expedite the relocation of the salt <br />storage facility and to begin making the future site pad ready by the first ground <br />thaw in the spring of 2020. It may be advantageous to do a separate structural and <br />precast bid package to expedite the erection of the new fleet maintenance building <br />as well; this will allow the construction duration to decrease and allow for a longer <br />design period ensuring the plan is well thought out before issuing for bid. <br />CONSTRUCTION <br />City of Ramsey 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.