My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/27/2019
Ramsey
>
Public
>
Agendas
>
Council
>
2019
>
Agenda - Council - 08/27/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:32:48 PM
Creation date
8/29/2019 2:24:11 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/27/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br />Fees Payable to the City <br />1. Park Dedication. The PERMITTEE is responsible for satisfying <br />applicable Park Dedication requirements. The 2019 Park Dedication Fee <br />applicable to the Plat is $5,100 per acre for commercial land and $4,375 per <br />acre for industrial land. PERMITTEE must pay a Park Dedication Fee of <br />Twenty Eight Thousand Three Hundred Ninety Four Dollars and No Cents <br />($5,100 x 1.75 acres and $4,375 x 4.45 acres = $28,394.00). The <br />PERMITTEE acknowledges that these fees are estimates. The rate in <br />effect when the Plat is recorded will be collected. <br />2. Trail Development Fees. The PERMITTEE is responsible for satisfying <br />applicable Trail Development Fee requirements. The 2019 Trail <br />Development Fee applicable to the Plat is $1,300 per acre. PERMITTEE <br />must pay a Trail Development Fee of Eight Thousand Sixty Dollars and No <br />Cents ($1,300 x 6.2 acres = $8,060.00). The PERMITTEE acknowledges <br />that these fees are estimates. The rate in effect when the Plat is recorded will <br />be collected. <br />3. Sanitary Sewer Connection (Trunk) Fees. The PERMITTEE is <br />responsible for satisfying applicable Sanitary Sewer Trunk requirements. <br />The 2019 Sanitary Sewer Trunk Fee applicable to the Plat is $3,652.00 per <br />acre. The PERMITTEE must pay a Sanitary Sewer Trunk Fee of Twenty <br />Two Thousand Six Hundred Forty Two Dollars and No Cents ($3,652 x 6.2 <br />acres = $22,6420.00). <br />4. Water Connection (Trunk) Fees. The PERMITTEE is responsible for <br />satisfying applicable Water Trunk requirements. The 2019 Water Trunk <br />Fee applicable to the Plat is $6,601.00 per acre. The PERMITTEE must <br />pay a Water Trunk Fee of Forty Thousand Nine Hundred Twenty Six <br />Dollars and No Cents ($6,601 x 6.2 acres = $40,926.00). <br />5. Sanitary Sewer Lateral Benefit Fees. The PERMITTEE is constructing its <br />own lateral service lines; therefore no sanitary sewer lateral benefit fee is <br />due. <br />6. Water Lateral Fees. The PERMITTEE is constructing its own lateral <br />service lines; therefore no water lateral benefit fee is due. <br />7. Stormwater Management Fee. The PERMITTEE is responsible for <br />satisfying applicable Stormwater Trunk Fee requirements. The 2019 <br />Stormwater Management Fee is $4,855.00 per acre. The PERMITTEE <br />must pay a Stormwater Management Fee of Thirty Thousand One Hundred <br />One Dollars and No Cents ($4,855 x 6.2 acres = $30,101.00). The <br />PERMITTEE acknowledges that these fees are estimates. The rate in <br />effect when the Plat is recorded will be collected. <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.